

Add to Cart
Digital Concrete Test Hammer HT75D For Brick Testing
KEY FEATURES
● High contrast OLED display
● All setup can be made on site
● Automatic calculating compressive strength
● Automatic correction of impact direction
● All data will be stored in memory
● All data can be transferred to PC by USB cable or Bluetooth
● Dual display for analogue ruler and digital value
Specifications
Model | HT-75D |
Type | Digital Only |
Display | OLED Digital |
Measuring Range | 10-100N/Mm2 |
Accuracy | ±0.1R |
Impact Energy | 0.075kgm (0.735Nm) For Testing Small And Impact-Sensitive Parts Of Concrete Or Artificial Brick |
Communication | USB2.0 Or Bluetooth(Optional) |
Printing | Bluetooth Micro Printer (Optional) |
Storage | 1000 Parts, 256 Data For Each Part |
Operating Temperature | -40º-60ºC |
Power Supply | 3.7V Li-Ion Rechargeable Battery Charged Via USB Port |
Dimension (Mm) | 280x75x60 |
Net Weight | 1.1kg |
Standard Package
HT-75Dmain unit 1
Grinding wheel 1
USB cable 1
USB charger 1
Software CD 1
Operation manual 1
Carrying case 1
Maintenance
For rebound apparatus, when one of the following situations occurs,
routine maintenance shall
be conducted:
Recoiling is over 2000 times
Be skeptical about the test value
Constant value of steel anvil rate is unqualified
Common maintenance methods shall fulfill the following requirements
After getting the recoiling hammer off, get out the internal
machine, and remove recoiling rod (get out the inside buffer
spring) and triple unit (including recoiling hammer, recoiling
tension spring and tension spring base)
Clean all components and parts of the internal machine with gas,
especially for central guide rod, inner bore and shock surface of
recoiling hammer and recoiling rod.
After cleaning the central guide rod, wipe it with a thin layer of
watch oil, while other components and parts shall not be wiped with
oil.
Clean the internal wall of shelf, remove graduated scale, and the
frictional force of inspection pointer shall be 0.5-0.8N
Can not rotate the zero setting screw fixed on tail hood
Self-made or changing components and parts are not allowed
After maintenance, calibration test shall be conducted according to
the requirements,and the calibration value shall be 80±2