Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

Brand Name:HONFENG
Certification:ISO9001:2008, SGS, etc.
Model Number:OWN
Minimum Order Quantity:1 pcs
Delivery Time:Based on client's needs
Payment Terms:L/C,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Hangzhou Zhejiang China
Address: Huafeng Road 2#, Xiacheng District, Hangzhou City, Zhejiang China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels


FeaturePre-Engineered Steel Buildings
Design CriteriaAISC, MBMA, AWS
Structural Base MaterialAll primary & secondary steel used by Mammut Building System has minimum yield strength of 50 KSI (345 N/mm2).
FoundationSimple design easy to construct and light weight
DeliveryAverage 6 to 8 weeks.
Sourcing & CoordinationBuilding is supplied complete withCladding and all accessories, including erection if required, all from one source of supply.
Structure WeightAbout 30% lighter through the-efficient use of steel. Primary framing members are (varying depth) tapered built-up plate sections with large depths in the areas of highest stress. Secondary members are light gage (light weight) cold formed (low labor cost) “Z” - or“C” shaped members.Z purlins / girts can be lapped. Lapping reduces the deflection, and allows double thickness at the points of higher stresses (support points).
DesignQuick and efficient since standardization of P.E.B. has significantly reduced design time. Basic designs are used over and over. Specialized computer analysis and design programs reduce design time and optimize material required. Drafting is also computerized with minimal manual drawings. Design, detail drawings and erection drawings are supplied free of charge by the manufacturer. Approval drawings may be prepared within 10 days to 3 weeks. Consultant in-house design and drafting time is significantly reduced, allowing more time for coordination and review, and increasing margins in design fees. Since most of the PEB are pin-based, the cost is reduced due to smaller sections at the base with smaller base plates and foundations (in absence of moments).
AccessoriesWindows, Doors,Ventilation etc.Designed to fit the system, with standardized, interchangeable parts, including pre-designed flashing and trims. Mass produced for economy. All available with the building.
ErectionEasy, fast, step by step. Erection costs & time are accurately known, based upon extensive experience with similar buildings.
ArchitectureOutstanding architectural design at low cost. Conventional wall, and fascia materials, such a concrete, masonry and wood, can be utilized.
Overall PricePrice per square meter may be as much as 40% lower than conventional steel.
ChangesVery flexible, tailor made, accepts changes and revisions easily. Future expansion is simple, easy and cost effective. One supplier to co-ordinate changes.
PerformanceAll components have been specified and designed specifically to act together as a system, for maximum efficiency, precise fit up, and performance in the field conditions world wide has resulted in design improvements over time which allow dependable prediction of performance.
ResponsibilitySingle source of supply results in total responsibility for one supplier, including design liability.
China Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels supplier

Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

Inquiry Cart 0