Double Head Pipe Shrinking Machine 60mm Tube End Forming Touch Screen

Brand Name:Xingyu
Certification:ISO9001-2000
Model Number:G400
Minimum Order Quantity:1
Delivery Time:60days
Payment Terms:30%advanced payment by TT,70% before shipment
Contact Now

Add to Cart

Verified Supplier
Address: Lingjiang Green Industrial Park Zhangjiagang, Jiangsu, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Double Head Pipe Tube End Forming Machine Pipe End Forming Machine


Double head pipe tube end forming machine pipe end forming machine pipe shrink expansion end forming machine uses linear guide rail as carrier to make the operation wear-free and the product repeatable. It is suitable for end treatment of Brass / Copper, Stainless Steel, Aluminum, Aluminium Alloy, Carben steel pipe and solid bars. It was widely used in mass production of pipe end shrinkage, diameter expansion, bulging, upsetting, flanging, and other shapes. It is suitable for various shapes of pipe end connection, automobile oil pipe, air pipe, water pipe, air conditioning pipe, connection parts and etc.. with high efficiency.


Specification/Model
SM20TNC
Remark
Max outer diameter×wall thickness
Φ33mm×3m
1. The max processing length can be extended according to the customer's requirement.
2. Double-end distance can be extended according to the customer's requirement.

Max processing length
220mm
Double end distance
450
Hydraulic system pressure(Mpa)
14Mpa
Working speed
2-3/s/Piece
Diamension
2470X1530X1770
Weight(kg)
2380kg

Quick Detail:

1. Type: pipe-shrinking machine

2. Model Number: G400

3. Used in: G400 pipe-shrinking machine is for making pipe before drawing machine,the material can be any metal.G400 pipe-shrinking machinecan roll pipe diameter of 12--25mm to 10--20m


G400 pipe-shrinking machine operations and processes


1. Take out the mould by rotating it according to arrow direction, no reverse rotation is allowed.

2. Moulds can be changed according to different specifications.

3. Head length can be adjusted by middle adjusting rod, loose the belt wheel screw, adjust the length and fasted the screw again.

4. Pour in 80% diesel and 20% engine oil, as the oil pump capacity is big, oil box entrance valve should be fully open, machine valve fix a little oil is ok.

5. After the umbrella block wear down and the gap becomes big, you can put a gasket between the umbrella block and the mold, but the gasket can not be too thick so that the machine won't get stuck.

6. The lubrication oil should be changed after it gets dirty.


Safety Precautions


1,Place the machine on a fixed horizontal surface and the calibration level, the machine is stable.

2,Check the oil level before use, to keep the hydraulic oil target position in 1/2 or more.

3,Check the motor rotation, such as rotation error, please adjust the power wiring.

4,When the state machine automatically, please confirm the accuracy of the input data.

5,When the machine is operating, safety, the hands, the body, such as near the action area is prohibited.

6,People must be dedicated machine operation, and the operator should be able to reach and stand within the scope of the emergency stop button.

7,Machine must be grounded.

8,When remove mold, must turn off the power.

9,Please refuel oil regularly.

10,Keep the machine and the environment clean.

11,Not allowed to work in the dust, conductive particles and acids and other places.


Factory picture:



Part of the machine:



China Double Head Pipe Shrinking Machine 60mm Tube End Forming Touch Screen supplier

Double Head Pipe Shrinking Machine 60mm Tube End Forming Touch Screen

Inquiry Cart 0