Add to Cart
Transmission Line Stringing Tools Cable Pulling Winch 50kN Pulling Force
Model | Gear | Pulling force(KN) | Pulling speed(m/min) | Power | Weight (kg) |
BJJM5Q | Slow | 50 | 5 | HONDA GASOLINE GX390 13HP | 190 |
Fast | 30 | 11 | |||
Reverse | - | 3.2 | |||
BJJM5C | Slow | 50 | 5 | Diesel engine 9kw | 220 |
Fast | 30 | 11 | |||
Reverse | - | 3.2 |
It is used for tower erection and sagging operation in line
construction. It can also be used for pulling conductor or
underground cable. The winches are the construction tools of
erecting electric circuits of high pressure electric transmission
in the sky and laying electrical cables underground. It can
complete the tasks of heavy-lifting and dragging such as erecting
the wire. Testified by the experiments and practical uses, they
have reasonable structure, small volume, light weight, strong
power, nimble operation and convient transporting. Based on so many
advantages.
Features:
1. Speedy and Efficient.
2. Safe and Reliable.
3. Compact structure.
4. Small volume.
5. Light in weight.
6. The wire rope can be directly wound on the winch.
Operation methods
1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.
2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.
3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.
4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.