

Add to Cart
Fully Automatic High Speed Disposable Surgical Mask Making Machine
Full Automatic face mask production line is composed of a mask body machine and one or two or three ear elastic or tie welding machine. Output can reach120-200 pieces per minute.
We have full auto ear loop or elastic face mask productine line, tie band face mask production line or customized type face mask making machines.
Semi auto face mask making machine also available.
Feature of production line face mask making equipment:
The machine is made of aluminum alloy which makes it
beautiful,prevented from rust and has a small size.
The machine can make the 1--5 levels mask blank according for the
customer's require with a high output;
You can adjust the size of the mask blank and the folding location;
The direction of the earloop is outside;
Compared with sub-mask production equipment, this set of equipment
more efficient, more economical artificial;
The computer program control and photoelectric detection make it
have a high reliability and low failure rate;
Technical Specification Details:
No | Item | Quantity |
1 | Ultrasonic | 6sets(Shangrong) |
2 | Motor | 1set TaiWan “YongKun” |
3 | Servo motor | 3sets (Delta) |
4 | Inverter | 1set TaiWan “Sunfar” |
5 | PLC | 1set Japan “Mitsubishi” |
2sets (Delta) | ||
6 | Touch screen | 1 set TaiWan “Wei- Lun” |
7 | Transport motor | 5sets |
8 | Static eliminator | 2sets(Guangdong) |
9 | Cylinder | New Christine and AirTAC |
10 | Constant Tension System | four sets |
11 | Conveyor | 2 sets |
12 | Bearing | NSK |
13 | Frame: | Aluminum |
14 | Closure plate | stainless steel |
15 | Reducer | 3sets |
FAQ
1. Q: What is your after-sales service?
A: 24hours online service and engineers can go to your factory for installing and training if required.
2. Q: How does your factory do regarding quality control?
A: Quality is our priority. We always pay great importance to quality controlling (even a small screw we will choose the best quality) from the beginning.
3. Q: How long is the warranty period?
A: ONE year, three months for quick weary spare parts.
4. Q: How long is your delivery time?
A: About 20 days
5. Q: What is the terms of payment you accept?
A: We usually accept the T/T payment, we need 50% of total amount as deposit, balance before delivery.