Add to Cart
Cereal Bar Pressing Cutting Machine Granola Bar Making Machine
Introduction
High Capaicty Muesli Bar/Granola Bar/ Sesame Bar/ Nuts Bar Cutting
Machine Rectangular Shape, realizes gentle pressure forming, regular shapes ,beautiful
appearance.
Peanuts material mix sugar after pour into the hopper machine,
machine automatic points in material, fabric, soft pressure,
cooling and demoulding, finish the delivery.
1. Combined procedures into one: Filling materials - Pressing shape - Cooling materials - Cutting muesli bar - Conveying & cooling muesli bar.
2. Material hopper is made by food grade HMWHDPE to avoid the sticking materials, also has heater to keep temperature. The filling blade is made by PTFE, and could evenly and stably fill the materials to conveyor belt, without materials wastage.
3. Controlled by Siemens PLC and touch screen with friendly interface. The staff could 180°rotate the touch screen, flexible and convenient.
4. The controller languages can be Chinese, English, French, Arabic, Spanish, Russian, etc.
Motor | WEG or Siemens | Mixing Tank and Conveying Belt | HMWHDPE |
PLC & Touch Screen | Siemens | Mixing Blade, Mold and Hopper Blade | PTFE |
Electric Parts | ABB or Schneider | Cover Body | Stainless Steel |
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension | Workers Required |
400-600kg/hr | 15.2kw | 380V 50Hz | 6.65 x 1.31 x 2m | 3-4 workers |
Machine Picture
Our service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we
supply 1 year guarantee from the date of completion of
commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.