25*25mm Powder Coated Aluminum Square Tubing Frame With Connector For Display Shelf

Brand Name:Xinyu
Certification:ISO9001/ISO14001/OHSAS 18001
Model Number:XY-0625-06
Minimum Order Quantity:500kgs
Delivery Time:Within 20 days after received your deposits
Payment Terms:T/T,30% advanced deposit, the balance paid off before loading, or consulting.
Contact Now

Add to Cart

Verified Supplier
Address: No.1505,Chengyang Road,Zhouzhuang Town,Jiangyin City,Jiangsu,China
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

25*25mm Powder coated aluminum square tube frame with connector


Product Description

Our factory can do these raw material Alloy No: 6061,6063,6060.

Aluminium Alloy Composition:

Chemical Composition6063 T5
SiFeCuMnMgZnTiCrOtherstotal others
0.2-0.6M.0.35M. 0.1M. 0.10.45-0.9M. 0.1M. 0.1M. 0.1M. 0.050.15
Mechanical property
Yield StrengthTensile StrengthExtensibilityhardness
110Mpa160Mpa8%8 HW
Chemical Composition6063 T6
SiFeCuMnMgZnTiCrOtherstotal others
0.2-0.6M.0.35M. 0.1M. 0.10.45-0.9M. 0.1M. 0.1M. 0.1M. 0.050.15
Mechanical property
Yield StrengthTensile StrengthExtensibilityhardness
180Mpa205Mpa8%

FAQ

1. Prices fob:

Need receive your draws and need surface treatment.

2. Payment terms:

30% advance payment and balance payment before the goods load into the container.

3. Handing time:

normally extrusion workshop 12hours and other workshop 9hours.

4. MOQ:

any small order quantity always best welcome.
but normally the cost for 1x40'or1x20'container order quantity are lowest cost. 40' about 20-26tons and 20'about 8-12tons.
normally if one set tooling die mould finish 3-5tons then no any die mould charge. but no problem. we will also return back the die mould money after the order quantity finish 3-5tons in 1 year.
normally one set die mould finish 300kgs then no any added machine cost.

Do not worry about that you can feel freely choose and confirm you need order quantity. anyway I will try my best supply you lowest prices.

5. Delivery time:

normally produce new die mould and sample about need 15days. 1x20'or 40'container order quantity about need 15-30days.
but we will try our best to supply you according to your need times.


China 25*25mm Powder Coated Aluminum Square Tubing Frame With Connector For Display Shelf supplier

25*25mm Powder Coated Aluminum Square Tubing Frame With Connector For Display Shelf

Inquiry Cart 0