Powder coated Steel Tubular Pole , Wi-fi Monopole Tower with Inner Climbing Ladder

Brand Name:JSHG
Certification:XK11-001-00105X
Model Number:JSHG-TX
Minimum Order Quantity:One 40 HQ Container
Delivery Time:1 week
Payment Terms:Western Union, L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Address: Wanshi Industrial Zone, Yixing City, Jiangsu Province, P.R. China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Powder coated Steel Tubular Pole , Wi-fi Monopole Tower with Inner Climbing Ladder


Specifications:


Application: Telecommunication, broadcasting, etc


Material: Q235, Q345, Q420, Q460, ASTM A527 A36, GR50, GR65, ST-37, ST-44, ST-52, S355JR, S355J2G3, SS41, SS50, SS55


Wall thickness: 2~30mm


Shape: Conical, Round, Polygonal


Base plate: Base plate is square/round/Polygon with slotted holes for anchor bolt and dimension as per client’s requirement.


Surface Treatment: Hot dip galvanization in accordance with American standard ASTM A123 or AS/NZS 4680:2006


Description:


Our steel tubular poles are used widely in the many important industry. The Telecommunication Industry is one of the important application of our steel tubular poles.


The new model wifi tower has many advantages. It can be powder coated with different colors according to client’s requirement which not only beautify the environment but also prevent the pole from corrosion. What is more, telecommunication monopole tower occupies less land and needs short construction cycle which greatly reduces construction cost, but its easy installation and maintenance shows strong practicability.


Installation Site:



Engineering and Design Management



Quality Control Management




Terms and Conditions


1. Price Term: EXW, FOB, CFR or CIF.

  • The price includes pole shaft, base plate, cross arm and anchor bolt.
  • Shipping seaport: Shanghai Seaport.
  • Please provide drawings if you have so that we can calculate the accurate price for you.
  • We also provide design according to your requests, if you don't have drawings.

2. MOQ: One 40FT Container.


3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.


4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.


5. Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom, or according to clients requirement.


Please feel free to contact us!


Hot Dip Galvanized Steel Tubular Pole for Electrical Power Transmission and Distribution Line, Outdoor Lighting Project, Telecommunication Industry, Traffic System, Wind Power Project.pdf

China Powder coated Steel Tubular Pole , Wi-fi Monopole Tower with Inner Climbing Ladder supplier

Powder coated Steel Tubular Pole , Wi-fi Monopole Tower with Inner Climbing Ladder

Inquiry Cart 0