

Add to Cart
Stud&Track roll forming Machine
Machine Pictures
Profile drawing
Product Descriptions
The structure is simple and the appearance of the drywall stud and track roll forming machine is beautiful because we adopt the shape-steel structure and most of the screw is which make the machine flexible and stronger. All the components of machine are from brand-famous enterprise so that they ensure the machine normal function very effectively.
Working Flow
Uncoiler —Feeding —Roll forming —Hydraulic cutting —Output table
Product Parameters
Model Number | DBRF |
Condition | New |
Production Capacity | 10-15m/min |
Forming Speed | Max 12m/min |
Weight | 5-15T |
Thickness | 0.3-0.8mm |
Roller Stations | 13stations |
Roller Material | 45#steel |
Cutting blade material | Cr 12mould steel |
Material of shaft | 45#steel |
Diameter of shaft | 65-95mm |
Motor Power | 4-7.5kw(Depend on final design) |
Hydraulic Power | 3kw(Depend on final design) |
Voltage | 380V 50Hz 3Phases |
Length Tolerance | +-1.5 |
Drive Way | Chain transmission |
Chain Size | 0.6-2inch |
Product Parameters
No. | Name | Qty |
1 | Decoiler | 1 |
2 | Main roll forming machine | 1 |
3 | PLC Control box | 1 |
4 | Hydraulic station | 1 |
5 | Output table | 2 |
Application Pictures
Stud tracks are widely used in luxury villas, high-end hotels, office buildings and shopping malls. It is sturdy, durable, and highly resistant to corrosion. It is also popular with construction units and construction units in terms of price, reducing the quality concerns of the project during construction, and frequent maintenance due to material quality problems during use. Greatly reduce the construction cost and various troubles caused by maintenance during use.
Package&Delivery
Our exhibitions
Our showroom
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125 kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the tickets
so that I can prepare and book a hotel for you,we will arrange for car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
9. What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.