

Add to Cart
Application of Gutter Roll Forming Machine
The gutter, also known as the "rain trap", is a narrow passage or
trough that forms part of a roof system that collects and transfers
rainwater from the edge of the roof.
The main purpose of the gutter is to protect the foundation of the
building by taking water out of the base. Drains also help reduce
erosion, prevent leakage in basements and crawl spaces, protect
painted or stained surfaces by reducing exposure to water, and
provide a means of collecting rainwater for later use.
Gutter Roll Forming Machine Technical parameters
Items | Specifications | |
Material of coil | Material | Aluminum |
Material Thickness | 0.3-0.8mm | |
Manual Uncoiler | 3 tons | |
Forming system | Rolling Speed | 10-15m/min |
Roller Stations | 16 stations | |
Shaft Diameter | 56mm | |
Roller Material | 45#steel | |
Shaft Material | 45#steel | |
Main Motor Power | 5.5kw | |
Frame | Wall plate | |
Transmission | Chain | |
Hydraulic system | Hydraulic Power | 3kw |
Blade Material | Cr12Mov | |
Tolerance | +-1.5mm | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase(customized) |
PLC Control System | Panasonic | |
Encoder | Omron |
Main Components
No. | Name | Qty |
1 | Manual uncoiler | 1 |
2 | Main roll forming machine | 1 |
3 | PLC Control box | 1 |
4 | Hydraulic pump station | 1 |
5 | Output table | 2 |
Profile drawing to design of Gutter Roll Forming Machine
Machine pics
After service
Shipping pics
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful
installation and commissioning of the equipment at the Buyer’s
Installation site. During which all parts damaged because of
quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install
and operate is provided face to face. If not, manual and video is
provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do
installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission
and training. The buyer has to pay USD100/per day and visa fee, air
tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians
available to maintain the machine overseas to customers’ workshop
if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days
after receiving deposit. Some machines in stock, can be delivered
at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and
profile drawing you provide. Our engineers can offer the best
professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125
kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the
tickets
so that I can prepare and book a hotel for you,we will arrange for
car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station),
half an hour.