Galvanized Electricity Steel Metal Utility Poles 120 Ft Shigh Tension Power Lines

Brand Name:MilkyWay
Certification:ISO9001/BV/
Model Number:Steel Utility Poles
Minimum Order Quantity:1 pcs
Delivery Time:20 working days after received your payment
Payment Terms:T/T, L/C at sight
Contact Now

Add to Cart

Verified Supplier
Address: No.1 Yinhe road, Wanshi town, Yixing, Jiangsu,China 
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

Galvanized Electricity Steel Metal Utility Poles 120 Ft Shigh Tension Power Lines


Specifications:


HeightFrom 9 meter to 100 meter
Suit forElectric Power Transmission and Distribution
ShapePolygonal or Conical
Material

Normally Q345B/A572, Minimum Yield Strength ≥ 345 N/mm²

Q235B/A36, Minimum Yield Strength ≥ 235 N/mm²

As well as Hot rolled coil from ASTM A572 GR65, GR50, SS400

Power Capacity10kV to 220kV
Tolerance of the dimensionAccording to client’s requirement.
Surface treatmentHot dip galvanized Following ASTM A 123, or any other standard by client required.
Joint of PolesSlip joint, flanged connected
StandardISO 9001:2008
Length of per sectionWithin 14 meter once forming
Welding StandardAWS (American Welding Society ) D 1.1
Thickness1 mm to 36mm
Production ProcessRaw material test → Cutting →bending →Welding (longitudinal )→Dimension verify →Flange welding →Hole drilling →sample assemble → surface clean→ Galvanization or powder coating ,painting →Recalibration →Packages
PackagesPacking with plastic paper or according to client’s request.

Material
Usually Q345B/A572,minimum yield strength>=345n/mm2
Q235B/A36,minimum yield strength>=235n/mm2
As well as Hot rolled coil from Q460 ,ASTM573 GR65, GR50 ,SS400, SS490, to ST52-


Production Process
Raw material test → Cutting →bending →Welding (longitudinal )→Dimension verify →Flange welding →Hole drilling →sample assemble → surface clean→ Galvanization or powder coating ,painting →Recalibration →Packages


Galvanization
Standard:NFA91121
Average thickness of the galvanization:Not less than 86μm.


Installation
-Remove all the equipment on the pole during Assembly.
-Circle a sling around th epole shaft of each section.
-Fix the sling on top section to one pulley block.
-The sling on the bottom section is tightly fixed and fixed at the center of gravity.
-Make the steel pole vertical by tighten the sling of the top section.
-Fix the steel pole.
-Remove the sling.


Company Introduction:
Jiangsu Milky Way Steel Poles which established on 1991 is located in Wuxi,East of China ,near one of the largest sea port of China ,Shanghai,Port .
Our Company has 24 years experience on producing the steel poles including the transmission power pole,street light pole,high mast pole and so on.
We exported to oversea countries since 1991 and our products have been delivered to more than 70 countries and areas ,including America,Australia ,Russia ,Germany ,Span,Philippines ,Malaysia,Africa and so on.
We are the supplier of many big project in many countries,like the street light pole of Dubai Tower.the high mast pole for Sochi Winter Olympic Game and so on.


China Galvanized Electricity Steel Metal Utility Poles 120 Ft Shigh Tension Power Lines supplier

Galvanized Electricity Steel Metal Utility Poles 120 Ft Shigh Tension Power Lines

Inquiry Cart 0