

Add to Cart
Two In One Light Keel Roll Forming Machine , Metal Forming Equipment 0.2mm - 1.2mm Galvanized steel
Technical Parameter
Items | Specifications | |
Material of coil | Material Thickness | 0.2-1.2mm galvanized |
De-coiler | Weight | 3 ton manual |
Forming system | Rolling Speed | 10-12 m/min |
Roller Stations | About 13 stations forming/ 13 stations | |
Roller Material | Gcr15 Steel with quenching | |
Shaft Material | 45# Steel Diameter 75mm shaft | |
Maim Motor Power | 7.5 kw | |
Hydraulic cutting Power | 4 kw | |
Cutting system | Material Of Cutting | CR12 with quench treatment |
Hardness | HRC58-62 | |
Tolerance | +-1.5mm | |
Cutting blade | 1 set of cutting blade | |
Electrical control system | Electric Source | 220V, 60HZ,3 phase |
Control System | PLC with touch screen Japanese Panasonic and Yaskawa Brand | |
Weight | About 3 tons | |
Way Of Drive | 1 inch single chain | |
Size of machine | Length 5500mm* Width 800mm* Height 1500m |
Machine Components
3 ton passive de-coiler | 1 set |
Main roll forming machine | 1 set |
PLC Control box | 1 unit |
Hydraulic station | 1 unit |
Cutting device | 1 unit |
Out table | 2 units |
Flow Chart
Decoiler—feedingwithguide—Rollforming——Cutting—Products collecting
Profile Drawing
Machine Photo
Installation of the machine
The installation comprises of:
- Installation by Sussman service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
- Raw material,process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.