16 Stations 2-3M/Min Galvanized Steel Roll Forming Machine For Vineyard Fence Post

Brand Name:SUSSMAN
Certification:CE, SGS, ISO9001
Model Number:SS-VY
Minimum Order Quantity:1 set
Delivery Time:60-90 working days after payment
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

About 16 Stations 2-3M/Min Galvanized Vineyard Fence Post Roll Forming Machine​


Vineyard is widely used for grape stake at Chile, Peru, Spain, France, it is light, easy to move and not easy be broken compare to the normal wooden stake.


Technical Parameter


1.1Rolling speed2-3m/min
1.2Rolling thickness1.2-2mm
1.3Raw materialGalvanized steel sheet G550
1.6dimension6500×600×1200(mm)
1.7Effective width50mm
1.8Roller stations

About 16 stations


1.9Roller materialGcr15, coated with chrome, Quenching
1.10Shaft diameterΦ60mm ,material is 45# forge steel
1.11TransmissionBy Chain
1.12Material of chain45# forged steel with frequency quenching, 12A
1.13Main Motor7.5kw
1.14Material of cuttingCr12Mov with quench HRC58-62°
1.15Cutting Tolerance6m+-1.0mm
1.16Voltage220v, 60hz, 3phase

Main Components


S.N

Equipment Name

Quantity

1

3T hydraulic De-coiler

1 set

2

Leveling device 200mm

1 set

3

Servo feeding device 200mm

1 unit

4

Press machineJH21-63

1 unit

5

Main roll forming machine

1 set

6

Cutting holder

1 set

7

Hydraulic station

1 set

8

Control system ( including control box)

1 set

9

Out tables

2 units

10

Spare parts

1 package

16

Cutting dies

1 set

17

Punching die set

1 set


Working Flow of Roll Forming Machine


Decoiler----feedingwithguide---Punching----Rollforming----Cutting----Products collecting


Profile of product



Loading pictures



After-sale Serive

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


China 16 Stations 2-3M/Min Galvanized Steel Roll Forming Machine For Vineyard Fence Post supplier

16 Stations 2-3M/Min Galvanized Steel Roll Forming Machine For Vineyard Fence Post

Inquiry Cart 0