150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching

Brand Name:SUSSMAN
Certification:CE
Model Number:SS-FD
Minimum Order Quantity:1 set
Delivery Time:65-75 days after deposit
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching


Fire Damper Technical Parameter

ItemsSpecifications
Material of coilMaterial Thickness1.0-1.5 mm galvanized coils
Un Coiler3 tons hydraulic
Servo feedingMotorDelta 1.8kw
Punching devicePunching4 sets of punching die
Forming systemForming SpeedAbout 2-3pieces/min
Roller StationsAbout 16 stations
Roller Material

Gcr15 coated with chrome


Maim Motor Power7.5kw
Motor cutting Power5.5kw

Cutting

system

Material Of CuttingCR12mov with quench treatment
HardnessHRC58-62
Tolerance+-1.5mm
Cutting blades1 set
Electrical control systemElectric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s requirey

Control SystemPLC Delta as list in the note
WeightAbout 8 tons
Way Of Drive1.2 inch chain
Machine sizemm10000mm*700mm*1000mm




Fire Damper Main Components


S.N

Equipment name

Quantity
1.

5T passive un-coiler

1 set
2.

Main roll forming machine


1 set
3.

Hydraulic cutting

1 set
4.

Control system (including control box)

1 set
5.

Punching

2 sets













Working Flow of Fire Damper

Decoiler----Feeding---Roll forming---Cutting---Run out tables



Samples



Advantage for Fire Damper

1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable


After-sale Serive

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

China 150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching supplier

150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching

Inquiry Cart 0