synthetic resin tile making machine price

Brand Name:Acemien
Certification:ce
Minimum Order Quantity:1
Delivery Time:45days
Payment Terms:T/T
Place of Origin:china
Contact Now

Add to Cart

Active Member
Location: Suzhou Jiangsu
Business type: Manufacturer, TradingCompany
Address: No.399,Hexing yangjin road,Jinfeng town,Zhangjiagang city, Jiangsu Province, China
Supplier`s last login times: within 18 hours
Product Details Company Profile
Product Details

ACEMINE

No.

Machine

Qty.

Remark

1

Screw loader for SJZ 80/156 extruder

1set

Tile extrusion line


Ridge tile forming

2

SJZ 80/156 conical twin-screw extruder(PVC)

1set

3

Vacuum loader and drying hopper for SJ50/30 extruder

1set

4

SJ50/30 single screw extruder(ASA)

1 set

5

Extrusion mould

1set

6

Distributor

1 set

7

stretching roller

1set

8

Calibration mould

1set

9

Side cutter and Haul-off unit

1set

10

Cutter

1set

11

Stacker

1set

12

Ridge tile oven

1set

13

Ridge tile forming machine

1set





14

Screw loader for SRL-Z300/600 Mixer

1set

Auxiliary equipment

11,Stacker

Technical data

Material: stainless steel

Length: 6000mm


12,Ridge tile Oven

Technical data


Two layer structure

Put the flat tile to the Oven, when the temperature reach to 150℃,put the flat tile to the

Ridge tile forming machine,

The final product see List 13


13,Ridge tile forming machine

Technical data


Cylinder control upside-downside

Ridge tile mould: Alloy aluminum


4. After-sales service

4.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.


4.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.

b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer’s factory.

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD50 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer’s factory.

e. If buyer doesn’t request installation and commissioning by Seller’s engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.


4.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of lading

During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.

c. Long-term service:

. ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

4.4. Validity: Three months since quotation date.

We thank you for your inquiry and would be pleased to receive your order soon.


www.plasticmachinery.net

Zhangjiagang Acemien Machinery Co., Ltd.

China synthetic resin tile making machine price supplier

synthetic resin tile making machine price

Inquiry Cart 0