ASTM B444 UNS N06625 DIN2.4856 Alloy 625 Tube

Brand Name:Torich
Certification:CE,ISO
Model Number:625
Minimum Order Quantity:1 tons
Delivery Time:7-20 days
Payment Terms:L/C, D/A, T/T, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

Torich ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube


Name:Torich ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube
Model:625
Out Diameter6-630mm
Thickness1-35mm
Finish:Polish, Satin, PVD and Golden
Package:PVC bag for each single piece, 4-8 pcs in a box, about 4-6 boxes into one carton, green weave bag outside the carton.
Delivery time:

15-25 working days.

Payment terms:TT, 30% down payment in advance, 70% balance before shipment
Trade terms:EXW, FOB, CIF,CFR,CPT

Inconel 625:


Application: Chemical process industry and sea water application. Inconel 625 is used in short term applications at temperaturesup to 816℃. For long term service, it is best restricted to a maximum of 593℃, because long term exposure above 593℃ will result in significant embrittlement.


Package:

1. cases packed in wooden cases
2. paper packaging
3. plastic packing
4. foam packaging


QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


Product show:


Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


Q:How is your production capability?
A:1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

Q:How to get the sample?
A:1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.


QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking



























China ASTM B444 UNS N06625 DIN2.4856 Alloy 625 Tube supplier

ASTM B444 UNS N06625 DIN2.4856 Alloy 625 Tube

Inquiry Cart 0