Add to Cart
Pneumatic Pressure 75L Banbury Mixer Machine With PLC Control
System
1. Introduction
Name:Plastic Mixer Type:Falling Or Internal
Material: Cast Steel Capacity:130-150 Kg/batch
Heating Way: Oil Or Steam Connect Way: cardan
Rotors:Chrome Plated and Alloy Hardfacing Electrodes
Feature: It is mainly used for plasticating, mixing and final mixing the stock
2. Description:
1. Technical parameter
2. Main character
3. Applications:
4. Equipment list
main body | 1 group |
press hammer and cylinder | 1 group |
material feeding device | 1 group |
discharge device | 1 group |
transmission device | 1 group |
electric control device | 1 group |
oil pressure and lubricate device | 1 group |
tubing | 1 group |
5. Main Technical Parameter:
Project Model | Working capacity of mixing chamber (L) | Rotating speed of rear rotor (r/min) | Main motor power (kw) | Weight (t) |
S-75L | 75 | 1:1.17 | 160 | 22 |
S-100L | 100 | 1:1.17 | 220 | 24 |
S-120L | 120 | 1:1.17 | 300 | 28 |
S-160L | 160 | 1:1.17 | 400 | 32 |
6. Competitive Advantage:
1. PLC control system
2. Lower noise, safer mixer
3. Excellent dispersing effect
4. Best mixing chamber to get 100% mixing effect.
5. Fast Mixing, good effectivity
6. Easier Maintenance.
7. Long life.
8. No leakage.
7. Service:
1. Oversea installation guide.
2. Oversea test running
3. Oversea worker training
4. Technical support
5. Supply of spare parts
6. Technical operation support
7. Formula and processing support
8. Option
Two rotor mixer, the relative rotation, the material from the feed
mouth clamp into the roll gap by rotor extruding and shearing,
after through the roll gap above the top tied pien is divided into
two parts, respectively along the chamber wall and the gap between
the rotor before and after the return to roll gap above.In a week
around the rotor flow, material is influenced by the shear and
friction action, make rubber temperature rise sharply, lower
viscosity, increased the wettability on the surface of the rubber
in the compound, make good contact with rubber and compound
surface.
9. Commercial Terms
1. Delivery period: totally 6 months after the contact is
confirmed.
2. Payment: 30% of the total amount by T/T in advance as down
payment, 70% of total amount by T/T before shipment.
3. Spare parts: The seller will provide a set of valueless
vulnerable parts for free. The seller also suggests the buyer to
buy a set of spare parts which meets one year’s use again. The
seller will show the list of spare parts to the buyer for his
choose before delivery.
4. Appearance and color: appearance and color of the machines are
based on the seller’s standard. Of course, we can also custom-made
according to buyer’s request.
5. Electric power: The quotation above is based on 380V/50Hz. There
will be some additional fee and extended producing time for
custom-built electric power requirement.
6. Warranty period:
6-1. Machines: one year after successful debugging;
6-2. Electrical components: 6 months after successful debugging.
7. Debugging service and cost borne by Foreign:
7-1. The seller will send three or four technical workers (or more
as buyer’s request) to the place which appointed by the buyer for
the guidance of equipment installation and the debugging service;
7-2. Both buyer and seller should bear their corresponding charge
as below:
7-2-1. The seller is in charge of the fee cost in China but except
for the visa charge;
7-2-2. The buyer is in charge of the fee cost in Foreign and the
visa charge. This fee includes but not limited to the followings:
a. Round-trip ticket;
b. Transportation, meals, accommodation and communication fee
during business trip;
c. Allowance (manpower fee) USD 80.00 for per person a day (days
calculation: total days from the day on the business trip to
returning to China);
d. Translator: The buyer should hire a translator for the seller's
technical workers convenient field work communication, and for
completing the task successfully. Otherwise the seller will send an
additional translator. The buyer should be in charge of this cost
(refer to a~d).