

Add to Cart
1. Introduction of Product
26-45kg/unit 55KW-6P Occlusal Pattern NL-35L Dispersion Kneader For
Rubber
Name | Dispersion Kneader Mixer | Cooling Way | Cooling water |
Type | Tumblet Type | Feature | It is mainly used for rubber mixing. |
rotors | Chrome Plated and Alloy Hardfacing Electrodes | ||
Material | Cast Steel | Connect Way | Coupler |
capacity | about 35-42kg/unit | Certificate | ISO, CE |
2. Description:
Rubber&plastic industry, such as TPR, EVA, Rubber sole, Rubber
Roller, Hoses Belts, Sponges, Vibration Insulator, Elastic Cord,
Sealing Materials, Tire, Tapes, Master Batches, Pigment Ink,
Automboile Electric Rubber Parts, Chemical Industry Compounds, etc.
3. Equipment list
4. Applications:
It is widely used to mix the rubber, plastics and other rubber & plastics material.
5. Main Technical Parameter:
Type | NL-10L | NL-20L | NL-35L | NL-55L | NL-75L | NL-110L | NL-150L |
Main motor power(KW) | 22 | 37 | 55 | 75 | 110 | 160 | 220 |
Cylinder diameter(mm) | Ф160 | Ф200 | Ф250 | Ф300 | Ф350 | Ф420 | Ф500 |
Feeding mode (front / back) | Front type | Front / rear formula | |||||
Weight(KG) | 2300 | 4200 | 6500 | 8500 | 10600 | 14000 | 20000 |
Mounting dimensions(mm) | 2150x1350x2200 | 2350x1550x2400 | 2570x2180x2570 | 3370x2460x3180 | 3550x2560x3220 | 4245x2950x3380 | 4580x3200x4100 |
6. Competitive Advantage:
7. Service:
1. Oversea installation guide.
2. Oversea test running
3. Oversea worker training
4. Technical support
5. supply of spare parts
6. Technical operation support
7. Formula and processing support
8. Option
Two rotors mixer the relative rotation, the material from the feed
mouth clamp into the roll gap by rotor extruding and shearing,
after through the roll gap above the top tied pien is divided into
two parts, respectively along the chamber wall and the gap between
the rotor before and after the return to roll gap above.In a week
around the rotor flow, material is influenced by the shear and
friction action, make rubber temperature rise sharply, lower
viscosity, increased the wettability on the surface of the rubber
in the compound, make good contact with rubber and compound
surface.
9. commercial terms
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T
before shipment
2. Lead Time: 60 days after receiving the advance payment
3. Transportation: container, simple package ( PE film, salver)
4.Warranty period: From the day of the use of the machine in the
buyer’s factory:
(1) The mechanical Parts: 12 months
(2) The electrical Parts: 6 months
5. Installations and Commissioning
(1) Commissioning will have been made before shipment
(2) Overseas Commissioning and charges
one or two technicians will be sent to the buyer to guide the
installation and commissioning of the equipment if the customer
requests.
Customers need topay the charge of our technicians.
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3) The allowance for the technicians is USD 80 per day for one
person.
(4) An interpreter is needed.
6. Spare parts:
Spare parts for one year are needed for the customers, and we
suggest that customers should buy the spare parts. (Fittings list
will be provided.)
7. English manual, Figuration drawing and footing drawings are
provided.