Recycle Paper Moulding Egg Tray Machinery High Output Egg Box Production Line
Product Descriptions:
Product Parameters:
Product Name | Paper Moulding Egg Tray Machinery |
Model Type | ER4000-B |
Output | 4000pcs/h (base on 30-packed egg tray, size 300x300mm, weight 65g~70g) |
Workshop Required | ≥600 m2 (for reference only, can adjust according to actual size of client’s plant.) |
Applicable Industries | Poultry, agriculture, carton production industry, printing industry, paper industry |
Container Required | 7 x 40 HQ |
Forming Machine | Rotary type with 8 plates. Each for 4 pcs/time |
Metal Dryer Size | 22x1.6x4m 6-Layers |
Fuel for Dryer | LPD / Natural gas / Diesel / Steam / Wood / Coal and etc. |
Production Consumption:
Electricity Consumption | ~160 kw/h |
Electricity Installed | 250 kw |
Material Consumption | 250~280 kg/h |
Water Consumption | 1.0~1.5 ton/h |
Operator Required | 4~5 persons/shift |
Choose one of the fuel from the three | Natural gas: 70~80 m3/h |
LPG: 25~29 m3/h | |
Diesel: 62~70 kg/h |
Applications:
1 | 15, 20,30,40packed egg tray… quail egg tray |
2 | 6, 10,12,15,18,24 packed egg carton… |
3 | Fruit tray, seeding cup and other Agricultural products |
4 | 2 or 4 packed cup holder |
5 | Disposable Medical Care Products like bedpan, sick pad, female urinal… |
6 | Industrial package |
How this Production Line Works:
YOUTUBE Video Links:
4000pcs/h with 6 layers dryer | https://www.youtube.com/watch?v=85eeIP8xCEY&t=3s |
6000pcs/h with 6 layers dryer | https://www.youtube.com/watch?v=YIeLPQnwO4M |
3000pcs/h with single layer dryer | https://www.youtube.com/watch?v=CX9NgjBZ0Nk |
4000pcs/h with single layer dryer | https://www.youtube.com/watch?v=JCu3xNpnCsM |
6000pcs/h with single layer dryer | https://www.youtube.com/watch?v=9XpyL-ggwi4 |
For more videos, you can search "Guangzhou Nanya Pulp Molding Equipment Company" on YOUTUBE and subscribe us. |
Main Business Terms:
Payment Terms | 30% down payment before production; 70% balance payment before delivery. |
Delivery Terms | FOB Guangzhou, China. (CNF and CIF are also available.) |
Delivery Time | 100~120 days |
Package | Export Standard Packing |
Warranty | 1 year |
Installation | Engineers available to service machinery overseas |
Quotation Validity | 90 days after the offering date |
Aftersales Service | We will send some spare parts by free. And we will provide operating manual, drawing, process diagram for all of the machine. We will instruct the operation, maintain method for the buyer’s worker after installation. |
Competitive Advantages: