Training Room HPL Laminate Acoustic Folding Office Wall Partition

Brand Name:EBUNGE
Certification:ISO 9001
Model Number:Model 65 folding office partition
Minimum Order Quantity:NO MOQ, small quantity welcome
Delivery Time:7-15 days
Payment Terms:T/T, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: No. 5-37, Fengxi 2nd Road, Hailong Street, Liwan District, Guangzhou, China
Supplier`s last login times: within 21 hours
Product Details Company Profile
Product Details

Training Room HPL Laminate Acoustic Folding Office Wall Partition


Folding Office Partition Features


1- 65mm ,85mm, 100mm aluminum frame thickness panel ,Max height up to 15 meters.


2- Top supported without floor track or guide, only have track on the ceiling.


3- Clear anodized extruded aluminum tracks and frames,customized powder coated color are available.


4- Sound insulation certificate :STC 32db to 52db, ASTM standard of acoustic tested in HongKong.


5- Available in wide range of finishes, melamine ,fabric/PU leather, HPL, printing etc.


6- Fast delivery and Rich experiences in oversea project installation guide & supervision.


Technical Information
ModelBG65
Suspension systemAluminum hanging
Basic thickness65mm
Total thickness65/75/85/95mm
Max heightUp to 4000 mm
Width600-1200 mm

Floor/ceiling sealing

strength

Telescopic aluminum tube with rubber strip

Side walls sealing

strength

Double seal tape
Sound insulation level22-35db

Folding Office Partition Installation


1. Please designate the responsible person before construction and leave contact information to facilitate communication between the two parties on construction logistics.


2. If the ground has been finished before the track construction, if the carpet, floor tiles, floor, etc. have been laid, you need to do ground protection to prevent the welding sparks from damaging the ground.


3. You need to provide the height of the shed after the decoration is completed. We will determine the height of the track installation according to this height.


4. Because we need to calculate the size of the hanging track, you need to provide the net size of the finished wall and the pillar. We will hang the track according to this size.


5. After the folding office partition track suspension is completed, the reserved wall size given by you cannot be changed. Because we calculate the construction according to this size, if the size is changed, the door panel will not operate.


6. The folding office partition should be horizontally perpendicular to the ground directly below the track, and the error should not exceed 1cm.


7. If there are other constructions at the same time, please do not pierce the foreign objects such as nails and insert them on the installed rails. This will cause the door pulleys to not run in the track.


8. Each group of tracks will have a “raw mouth”, which will be removed before installing the door panel, and then installed after the door panel is installed. This "raw mouth" cannot be sealed.


9. In order to facilitate future maintenance, please reserve the inspection port near the ceiling track to facilitate the maintenance personnel to enter the inspection port for product maintenance.


10. After the folding office wall partition panels are hung, it needs to be debugged. Please remember do not use the movable walls panel before our personnel have debugged the panel, otherwise forcible use will result in damage to the movable wall panels.


China Training Room HPL Laminate Acoustic Folding Office Wall Partition supplier

Training Room HPL Laminate Acoustic Folding Office Wall Partition

Inquiry Cart 0