8 Inch butt welded carbon steel pipe fittings schedule 40 carbon steel end cap

Brand Name:TOBO
Certification:SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED
Model Number:Cap
Minimum Order Quantity:1pc
Delivery Time:10-100 days depending on quantity
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

8 Inch butt welded carbon steel pipe fittings schedule 40 carbon steel end cap


Product Description
Product Name
8 Inch butt welded carbon steel pipe fittings schedule 40 carbon steel end cap
Size
1/2"-48" seamless,50“-110”welded
Standard
ANSI B16.9,MSS SP 43, DIN28011, EN10253, GOST17379, JIS B2313, MSS SP 75, etc.
Wall thickness
STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS and etc.
Type
Cap, Ellipsoidal head
End
bevel end/BE/buttweld
Surface
nature color, varnished, black painting, anti-rust oil etc.
Material
Carbon steel: A234WPB, A420WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH, P235GH, P265GH, P280GH,P295GH,P355GH and etc.
Pipeline steel: WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 and etc.
Cr-Mo allo steel: P11,P22,P5, P9,P91, 10CrMo9-10, 16Mo3 etc.
Application
Petrochemical industry;avation and aerospace industry;pharmaceutical industry;gas exhaust;
power plant; ship buliding;water treatment,etc.
Advantages
ready stock,faster delivery time;available in all sizes,austomized;high quality
Standard
ASTM DIN EN BS JIS GOST etc.
Name
Carbon Steel Stainless Steel Welding Pipe End Cap For Pipe Fitting
Surface treatment
black painting, anti-rust oil, sand blast
End
bevel end ANSI B16.25
Production process
seamless or welded
Material
A234WPB, A420WPL6, WPHY52, WPHY60,WPHY65,WPHY70, etc.
Application
Petroleum
Surface
Black Paint
  • FAQ

Q1: Are you trading company or manufacturer ?

A: We are factory.You can visit our factory if you have time, we also can take a video for you to show our office and factory.


Q2: How long is the delivery ?

A:Generally it is 5-10 days if the goods are in stock.it is 15-20 days if the goods are not in stock It is According the QUANTITY.


Q3: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q 4. What's the payment term?

A: We accept T/T 30% deposit and 70% balance before the shipment, West Union, VISA is also accepted.


Q5. Can I request to change the form of packaging and transportation?

A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.


Q6. Can I have my own Logo on the product?

A: Yes, you can send us your drawing and we can make your logo, but you have to bear their own the cost.


Q7. Can you produce the products according to my own drawings?

A: Yes, we can produce the products according to your drawings that will be most satisfy you.


China 8 Inch butt welded carbon steel pipe fittings schedule 40 carbon steel end cap supplier

8 Inch butt welded carbon steel pipe fittings schedule 40 carbon steel end cap

Inquiry Cart 0