Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress

Brand Name:D&T
Model Number:DTPUF-75
Minimum Order Quantity:1set
Delivery Time:45days
Payment Terms:T/T, L/C, Paypal
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Hangzhou Zhejiang China
Address: No.81 Golf Road, Fuyang District, Hangzhou City, Zhejiang Province, China
Supplier`s last login times: within 38 hours
Product Details Company Profile
Product Details

Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress

Product Description

3.2 Mould

Quantity: 2sets

Size: W2100*L2450*H1200mm


3). Configuration


3.1 Components (total 7 components)


No.

Component

Material Tank

Out-feed Pump

specification

1

PPG

3 Ton,A3 Steel

CB-7

Feeding Pump, Mixing device, Constant

Temperature Coil, Material Tank

Thermometer, Liquidometer

2

TDI

2 Ton,A3 Steel

NB2-C32F

Feeding Pump, Mixing device, Constant

Temperature Coil, Material Tank Thermometer,

Liquidometer

3

MC

500L

2mm Stainless Steel

NB2-D10F

Feeding Pump, Liquidometer

4

T9


50L

1mm Stainless Steel

HGP-2A-F2R



5

Silicone Oil

50L

1mm Stainless Steel

HGP-2A-F2R



6

A33


50L

1mm Stainless Steel

HGP-2A-F2R



7

Water

50L

1mm Stainless Steel

HGP-2A-F4R




2). Main Technology Data:

Max.Product Size: 2400mm×2000mm (L×W)

Max. Product Height: 1200mm

Quantity of component of foaming material: 7 (PPG, TDI, MC, Water, Silicone oil, T9,A33)

Density: 10Kg/m³~60Kg/m³

Maximum capacity: 150L/mould, discontinual Foaming(two moulds), 6~10 blocks per hour

Touch scream and semi-automatic control system with 100 foaming formula

Power of Mixing Head: 7.5kw(Brake motor)

Total Power: 30KW

Tearms:


Terms of Payment: 30% advance payment by T/T upon signing the contract

70% covered by T/T before delivery

Installation and Start-up:

2 technicians will be assigned to coordinate installation, commissioning and training,

cost for flight and suitable accommodation plus USD80/day will be charged additionally.


Warranty: 12 months limited warranty. Starting from date of delivery excluding wear parts.

Shipping cost for parts to be replaced during warranty period have to be borne by the customer.



China Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress supplier

Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress

Inquiry Cart 0