

Add to Cart
Package Boiler Wood Fired Steam Boiler Water Tube Steam Boiler
Boiler introduction
DZH model boiler adopts three pass structure, fire-water tube boiler, is a low cost manual fuel feeding single drum boiler. This model can use coal, biomass as fuel, has large furnace for burning. DZH hand operated moving grate type which needs labour to feed fuel and remove the dregs.
1. Adopting automatic screw feeding, with reasonable second air
technology and half gasification structure
helping fuel combusting completely, the thermal efficiency can
reach more than 90%. Stable flame, producing steam cautiously.
2. Primordial dust emissions density is low:The volume of the
coal-fired steam boiler is large and there is a dust separation
device, so the primordial dust emissions density will be controlled
much lower than the standard allowed.
3. Control system: Installing microcomputer to operate with
one-button, people just set the process, and it can work
automatically during the operating time. Once any abnormal
situation to happen, stopping automatically with sound-light alarm,
and pointing to the failure code, so it saves time to maintain.
Boiler advantages
The output power remain constant, high quality of steam
The boiler is heating up quickly and have high heat efficiency
Low original dust concentration,environmental protection and energy
conservation
Small size appearance, low investment in boiler room
Low running cost, safe and reliable (safety and reliability)
Short installation time, low installation cost
Technical Parameter
DZH steam boiler parameter
Boiler model | Rated capacity | Rated pressure | Feed water temp | Steam temp | Active grate area | Exhaust gas temp | Design efficiency | Fuel consump | Weight of main part |
t/h | Mpa | ℃ | ℃ | ㎡ | ℃ | % | Kg | Ton | |
DZH1-1.0-AII | 1 | 1 | 20 | 184 | 1.35 | 195 | 80 | 118 | 8.6 |
DZH2-1.0/1.25-AII | 2 | 1/1.25 | 20 | 184/194 | 2.7 | 198 | 80 | 238 | 10.9/11.3 |
DZH4-1.25/1.6-AII | 4 | 1.25/1.6 | 20 | 194/204 | 4.57 | 196 | 80 | 472 | 18 |
DZH6-1.25/1.6-AII | 6 | 1.25/1.6 | 20 | 194/204 | 8.59 | 189 | 80 | 685 | 23/24 |
DZH hot water boiler parameter
Boiler model | Rated thermal power | Rated pressure | Feed water temp | Steam temp | Active grate area | Exhaust gas temp | Design efficiency | Fuel consump | Weight of main part |
MW | Mpa | ℃ | ℃ | ㎡ | ℃ | % | Kg | Ton | |
DZH0.7-0.7/95/70-AII | 0.7 | 0.7 | 95 | 70 | 1.35 | 186 | 76 | 118 | 8.5 |
DZH1.4-0.7/95/70-AII | 1.4 | 0.7 | 95 | 70 | 2.7 | 185 | 76 | 238 | 10.8 |
DZH2.8-0.7/95/70-AII | 2.8 | 0.7 | 95 | 70 | 4.57 | 179 | 78 | 472 | 18 |
DZH4.2-0.7/95/70-AII | 4.2 | 0.7 | 95 | 70 | 8.59 | 179 | 80 | 685 | 22.9 |
Applictaion fields
1. Food industry: steam can be used for food disinfection, cooking;
Wine industry need to use steam;
2. Petrochemical industry: steam can be used to heat oil, to
strengthen the liquidity of oil;
3. Foam, furniture production: the steam can be used for producing
foam. When making furniture, wood needs to be dried with steam;
4. Filling block production:steam used for drying the aerated
brick;
5. Washing ironing industry: generally used in laundry, including
dry cleaning machines, dryers, washing machines, dehydration
machines, ironing machines, iron and other equipment supporting the
use;
6. Packaging machinery industry: labeling machines, sets of
standard machine;
7. Bio-chemical industry: fermentation tank, reactor, sandwich pan,
mixer, emulsifier and other equipment;
8. Food machinery industry: tofu machine, steamer, sterilization
tank, packaging machines, paint equipment, sealing machines and
other equipment;
FAQ
1. Are you a factory or a trading company?How about your factory's
strength?
(1) Yuanda boiler ia a company specializing in the research, design
and production of boilers for about 20 years.
(2) Company headquarters covers an area of 60000 square
meters,construction area of 4000 square meters.
(3) Has 350 employees,technical elite 35 people.senior engineer 10
people,professional and technical personnel 15 people.
2. What is the Warranty for the boilers?
3-year warranty with boiler spare parts becasue f quality
questions.Boiler body has lifelong warranty period about quality.
3.How about the installation and commissioning service?
(1) If customers need, our factory can send professional technician
to take chage of installation and commissioning ,and also can train
your workers to operate the boielrs.
4. How long should we wait for delivery?
(1) About the conventional models,we have semi-finished products,
so about 15-20 days can finish delivery. Special models need about
30-40 days.