Normalized Cold Finished Seamless Tube For Heavy Machinery Hydraulic Cylinder

Brand Name:Hongbao
Certification:TS16949,DNV,PED,ISO,TUV,LR
Model Number:HBCDSST-1
Minimum Order Quantity:1 ton
Delivery Time:within 50 days
Place of Origin:Jiangsu, China
Contact Now

Add to Cart

Verified Supplier
Address: DAXIN TOWN,ZHANGJIAGANG,JIANGSU P.R.CHINA
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

EN10305-1 E235 E355 Cold Drawn Seamless Steel Tube Normalized Cold Drawn Precision Steel Tube


Description

Delivery

Conditions

1. BK (+C)No heat treatment after last cold forming process.
2. BKW (+LC)After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR)After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A)After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper transformation

point in a controlled atmosphere.


DELIVERY CONDITIONS

The tubes can be produced in the following delivery conditions:

BK (+C) Cold finished/hard (cold finished as drawn).

No heat treatment after the last cold forming process.


BKW (+LC) Cold finished/soft (lightly cold worked)

After the last heat treatment there is a light finishing pass (cold drawing).


BKS (+SR) Cold finished/stress relieve annealed.

After the final cold forming process the tubes are stress relieve annealed.


GBK (+A) Annealed.

After the final cold forming process the tubes are annealed in a controlled atmosphere.


NBK (+N) Normalized. (Mainly focus on)

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere.


China Normalized Cold Finished Seamless Tube For Heavy Machinery Hydraulic Cylinder supplier

Normalized Cold Finished Seamless Tube For Heavy Machinery Hydraulic Cylinder

Inquiry Cart 0