Add to Cart
Non - woven Textile Stenter Machine , Even temperature , Low consumption
1. Machine applications:
Stenter is after-treatment processing of nonwoves such as shoe
material and carpet with fast speed and high quality.
The stenter non-woven machinery is suitable for after-treatment
processing of nonwovens, such as asphalt felt substrate, shoe
material and carpet, for less shrinkage and non-deformation.
2. Machine features:
1) Stenter chains
Both the horizontal return, the stenter chains are running in
lubricant-free chain tracks, which eliminate oil dripping in
chambers. All width adjustments are individually driven for setting
of different chain track shape required by the processes.
2) Treatment chambers
The treatment chambers reduce energy consumption effectively by its
space saving construction, large heating system and thick door
panels. The air circulation system with frequency-controlled fans
is proven to be the best solution for repeatable air circulation
control.
3) PLC automation control system
The automation control system is friendly Human-machine-interface.
All kind of precision detectors with machine controls can be
integrated into the stenter for supreme quality control of the
fabric upon request.
4) Heat setting control system
Continuous detection of fabric status in the treatment chambers and
automatic adjusting of processing speed ensure proper heatsetting
5) Integrated Exhaust Heat Recovery System
The stenter machine can be equipped with Exhaust Heat Recovery
System. The energy of exhaust gas from the stenter is recovered via
heat exchanger, whereby the condensed volatile impurities contained
in the exhaust gas can’t be released to the air.
3. Technical specifications:
Roller width: | 3600mm | Working width: | 3400mm |
Heat source: | nature gas | Width adjustment range: | 700-3400mm |
Chambers No. | 6 | Temperature of chamber: | 100-220℃ |
Fabric held by: | clip/pin/combined | Air pressure: | above 0.5mpa |
Overfeed range: | -10% to 30% | Installed power: | Approx 120Kw |
4. Payment Terms:
Payment Conditions: 30% down payment by T/T and the balance payment
should be TT or in irrevocable L/C at sight.
Delivery time: 60 days from the date of receiving down payment. All
payment should be received before delivery in China.
4.