Working procedure
1.Bottle entering →soaking→outer brusing→inner brushing→cleaning
water spraying and washing →drying→bottles come out
2.Note:the temperature of hot water containing soda: 50-55℃, concentration of water containing soda is about 2.5%
Washing part machine photo
FAQ
Questions and Answers:
Q:When will you deliver the product after the deposit?
A: About 30-40 days.
Q:what about the guarantee service?
A:One year from the machine operation within 20 months from the B/L
date.
Q:How to install the machine after its arrival?
A:We will prepare a brochure of introduction for you and We send
the engineers to help installing, commissioning and training, 50$
one people per day after the engineers start from our factory area.
Q: How to pay my order?
A: 30% deposit by T/T, the balance paid before loading by T/T.
Customer's service:
1.HIGEE company can provide turn-key project for you, only you have
any idea to start beverage factory plant.
2. HIGEEcompany have professional design team, our engineer can
draw bottle samples and flow chart ofworkshop for you .
3. HIGEE company give you the best quotation for all kinds of
beverage production, only you can tell me whichkind of drink you
want to product, what is your capacity(how many bottles one hour)
what is you bottle material, pet or glass,etc
After service:
1. We send the engineers to help installing, commissioning and
training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book
3. After one year guarantee, the seller provides payable spare
parts and technician’s VISITING maintenance service.