

Add to Cart
Best sell mineral water plastic bottle filling machine and pure water processing machine
The washing part for washing PET bottles before filling
The bottle washing machine is mainly composed of bearing parts,
water separating plate assembly, water tank assembly, bottle clamp
and other parts. High speed and mass flow filling valve ensures the
high filling speed and exact fluid level.
The filling part for filling bottling mineral water into bottles
The filling machine is mainly composed of liquid tank assembly,
liquid tank lifting device, filling valve and other components; the
function is filling the material into the bottle; the parts which
contact material are stainless steel and special materials, comply
with food hygiene requirements.
The capping part
Capping machine is composed of capping device, capping assembly,
capping head and capping principal axis etc.. The driver of capping
machine will transmit into gear by reducer, by rotating the center
transmits power to the screw head, and drives the cutting wheel to
rotate so as to drive the rotary of the dial cover plate.
Technical parameter:
Model | CGF32-32-8 |
Washing head | 32 |
Filling head | 32 |
Capping head | 8 |
Production capacity | 25000bph |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 2600Kg |
Our machine pictures :
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.