Add to Cart
Good quality water bottle filling machine price and mineral water filling machine and powder filling machine
Application:
It is suitable for filling water, non-carbonated drink, juice,
wine, tea drink and other liquid, working steable with famous
electrical components and working very stable.
This CGF Wash-filling-capping 3-in-1unit:Beverage Machinery is used
to produce polyester/glass bottled mineral water, purified water,
alcohol, tea drink and other non-gas beverage. It can finish all
the process such as bottle rinsing, filling and sealing fast and
stable. It can reduce the materials and Outsiders touch time,
improve the sanitary conditions, production capacity and economic
efficiency.
1. Using the wind sent access and move wheel in the bottle directly
connected technology;Canceled screw and conveyor chains,this enable
the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck
technology,bottle-shaped transform not need to adjust the equipment
level,only change relater the curved plate,wheel and nylon parts is
enough.
3. The specially designed stainless steel bottle washing machine
clip is solid and durable,no touch with the screw location of
bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve,filling
fast,filling accurate and no liquid lose.
5. Spiraling decline when output bottle,transform bottle shape
shape no need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology,the key
electrical components from famous company such as Japan,France
Schneider
7. Other product name:water filling machine,drinking bottle filling machine,drink water filling machine.water bottling plan and water equipment and beverage filling machine and juice filling machine and carbonated drink filling machine 3 in 1 and beer filling machine and soybean filling machine 3 in 1 monoblock etc
Flow Chart
Flow Chart of Automatic Monobloc Mineral Water Bottling
Plant/Production Line
A. Bottle production line PET Resin-Injection moulding
machine-Bottle blowing machine-PET bottle
B. Water treatment system Raw water-Pump-Silica sand filter-Carbon
filter-Water softer-Reverse Osmosis-UV sterilizer-Ozone
generator-Finished water tank
C. Filling&Packing part Bottle unscrambler-Air
conveyor-Washing,filling,capping 3 in 1 machine-Light checker-Blow
dryer-Dater printer-Labeling machine-Packing machine-Stock
Technical parameter:
Model | CGF60-60-15 |
Washing head | 60 |
Filling machine | 60 |
Capping head | 15 |
Production capacity | 35000bph |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 3000Kg |
Our machine pictures :
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.