Add to Cart
Golden supplier beverage filling machine and bottling machine for glass bottle /wine/energy drink/beer/ice tea
Application:
The bottling plant is mainly used in hot filling and sealing of green tea,black tea,wulong tea and fruit juice drink. This machine integrates washing,filling and capping together. The design is scientific and resonable. Its apperance is beautiful. Its operation and maintenance is convenient. The automation is high. It is good equipment for choosing hot drink filling machine.
Higee machine's beverage filling machine is the introduction of German technology, through digestion and absorption, combined with the characteristics of China's beer industry, beer filling and capping designed washing equipment, this machine adopts gear transmission. Stable conveying, filling is stable and reliable, convenient adjustment, the machine is set with automatic control for bottle and no bottle cap and no cap, stable performance.Advanced technology.The whole size can be accommodated in standard containers for convenient transportation.
Feature:
1. This machine is mainly used in the beverage filling operations.
The three functions of bottle washing, filling and capping are
composed in one body of the machine.
2. It is automatic in total process and suitable for PET bottled
juice tea drink which can resistant high temperature.
3. It also can be used for mineral water, pure water and many other no gas containing drinks.
4. It makes by high quality SUS304 and key parts are precision machined by NC tool.
5. The total machine adopts advanced photoelectric detection technology to detect each part's operation status, no bottle no filling, no bottle no capping, automatic easy operation.
6. Using the wind sent access, with clamp hanging the bottle neck which can keep the bottle shape high-speed.
7. Washing bottle mouth with special designed washing manipulator, clip in the bottle neck, stable avoid secondary pollution.
8. Filling uses lifting valve, adopts micro pressure filling principle to ensure correct filling.
9. Capping adopts French advanced technology, cap sorter install in a lower position, send cap in level position.
10. Host adopts advanced PLC automatic control technology, the key electrical components from famous company such as Japan Mitsubishi, France Schneider, Omron.
Technical parameter:
Model | CGF32-32-10 |
Washing head | 32 |
Filling head | 32 |
Capping head | 10 |
Production capacity | 12000-15000BPH |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 2300Kg |
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2. Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3. Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4. Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.