

Add to Cart
15000bph Beverage Filling Machine , Small Bottle Filling And Capping Machine
15000bph monoblock 3 in 1 beverage filling machine line , oil filling machine line, small bottle filling and capping machine
Technical parameters:
Model | CGF12-12-4 | CGF18-18-6 | CGF24-24-8 | CGF32-32-10 | CGF40-40-12 | CGF50-50-12 | CGF60-60-14 |
Maximum Production Capacity (b/h) | 3000 | 8000 | 12000 | 15000 | 20000 | 22000 | 24000 |
Our machine introduction:
This machine of Juice Factory Machinery adopts the automatic control technology of PLC and transducer with high degree of automatic.The dynamical system of juice making machine is connected by transmission shaft with stable performance.The filling principle of micro negative gravity increases the precision.The advanced automatic lubricating system witch equipped on juice making machine requires no manual effort and increases the life span of the machines.The noise of beverage filling machine is low and the overall machine is easy to maintain.The machine has PLc controller and touch screen,that make operation easily and accurate.The machine use high quality stainless steel ,which is easy to clean ,and no rust.that make the juice in tank more clean ,avoid polluted by the machine.We provide1 years warranty.during this period ,we provide free service and spare parts.
Technical parameter:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.