18KG Primary Current Injection Test Set 0-200A With CT Ratio Test And Timer

Brand Name:GFUVE
Certification:ISO9001, CE, KEMA
Model Number:TEST-200
Minimum Order Quantity:1SET
Delivery Time:7DAYS
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Beijing Beijing China
Address: Oriental HuaRui A, No. 150 Guanzhuang Road, Chaoyang District, Beijing, 100024, China
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

TEST-200 200A PRIMARY CURRENT INJECTION TEST SET FOR CURRENT TRANSFORMER ratio test


200A PRIMARY CURRENT INJECTION TEST SET FOR CURRENT TRANSFORMER


TEST-200 200A primary current injection test set adopts ARM Chip to control its output process and large capacity of toroidal transformers. It is equipped with LCD display and current meter; it can show primary current value, second current value, turn ratio and the action time. Packing is used as aluminum alloy body with PC panel. TEST-200 is mainly applied to CT turn ratio testing in the power system and contact resistance test which need large current.

The primary current injection method is usually the preferred test method because it includes the current sensors, wiring, and the current conduction path in the circuit breaker with the test. However, this method has one disadvantage in that it will not always detect sensor wiring and polarity problems.

If performing three-phase primary injection is not feasible, the sensors and wiring of the circuit breaker should be tested separately to verify that they are working correctly. The proper functioning of the trip unit can be tested using primary current injection, one phase at a time. Two adjacent phases may also be connected in series and tested as three pairs to check for current sensor polarity issues.
Because primary current injection testing is a relatively expensive service, it's usually performed only during the commissioning (start-up) process to supplement a program of periodic secondary-current testing. Circuit breakers that are part of a critical process or engineered safety system are often maintenance tested using primary injection due to their high reliability requirements.
Primary current injection test set for low voltage power circuit breakers​

PARAMETERS

Electrical parameters 
Accuracy±0.5%
Power Supply(AC)220V±10%·5A, 50Hz/60Hz or
110V±10%·10A, 50Hz/60Hz
Current Output (AC)200A·5V or 100A·10V
Capacity1KVA
The current output waveform distortion≤5%
Dual protectionoverload electronic protection and software protection
Primary current 
Range0-240A
Resolution0.1A
Accuracy<0.5%
Secondary measurement 
Range0-6A
Resolution0.001A
Accuracy<0.5%
Current duration 
200A range200A 2-3minutes
100A 3-6minutes
100A range100A 2-3minutes
With timer
Range0.0001~999.99S
Resolution0.001S
Accuracy<0.5%±5 words
Mechanical parameters 
Dimensions (W×D×H) (mm)430×260×260
Weight(kg)20
Environmental conditions 
Temperature-10°C to 40°C
Relative humidity≤80%

SELECTION GUIDE

ModelACCU
RACY
Primary
current
AMMETER
(0-6A)
TIMERPOWERINJECTION CURRENT TIMEDIMENSION(W×D×H)(mm)WEIGHTREMARK

TEST-901

0.5%0-1100AYESYES5KVA1000A: 2-3min;
500A:3-6min
430×260×26025KGIntegrated structure
TEST-9020.5%0-2200AYESOPTIONAL12KVA2000A:2-3min;
1000A:3-6min
360×300×295 and 320×300×30035KG+15KGFission structure
TEST-9030.5%0-3300AYESOPTIONAL15KVA3000A:2-3min;
1500A:3-6min
380×350×360 and 340×290×42048KG+42KGFission structure
TEST-9050.5%0-5500AYESOPTIONAL25KVA5000A:2-3min;
2500A:3-6min
430×430×445 and 550×450×60068KG+55KGFission structure
TEST-2000.5%0-240AYESYES1KVA200A: 2-3min;
100A:3-6min
430×260×26020KGIntegrated structure

China 18KG Primary Current Injection Test Set 0-200A With CT Ratio Test And Timer supplier

18KG Primary Current Injection Test Set 0-200A With CT Ratio Test And Timer

Inquiry Cart 0