Add to Cart
OEM Non - Standard SUS4403B CNC Machined Components of Punch
forming Processing
Introiduction of CNC machined component
1. Material: SUS440B, It is a stainless steel imported from Japan and used in surgical knives and wear resistant parts
2. Machining: For this CNC machined component, was finished by three processing technologies, Namely, surface grinding and precision Sodick EDM and punching formaing processing. Have to say about the punch processing, the processing is pure manual operation, need staff care and patience to persist for a long time.
3. Machined Equipements: Japan mitsubishi mirror EDM machine, surface grinder and punching formaing machine. And in our factory, there are other processing equipments, such as:
4. Surface finish: As for surface treatment, we list as follows:
5. Applied software: Pro/ E, Auto CAD 2000, solid work 2001, CAXA, UG, CAD, CAM
In short, any 2D and 3D format is acceptable
6. Product weight: Customized according to your drawings.
Our engineer had more than 11 years working experience on precision precision mold parts and CNC machined components
Kingrui is specialized in making precision mold parts, We can make custom processing product according to customer’s requirement. The quotation can be provide based on customer’s drawing or sample.Our molds have excellent quality and reasonable price.
Following is the basic informations for reference:
Name | OEM Non - Standard SUS4403B CNC Machined Components of Punch forming Processing |
Mold part material | H13, S- 7, P20, 718, 2738, NAK80, S136, etc. |
Mold basic | drawings |
Shape | According to customers' drawings |
Tolerance | 500,000- 1000,000 shots |
Design software | UG, PROE, CAD, etc. |
Drawings format | 2d or 3d |
Delivery time | 5- 15 days |
Specification | Depends on customer’s requirements |
Packaging & Shipping
A. Payment term: T/T 50% as deposit 50% before shipment
B. Packing: we pack goods strictly for your product safety
C. Shipment term: By express DHL, TNT, FEDDEX, EMS and so on
D. By air or by sea
E. Leading Time: Usually It needs 5- 15 days, base on parts quantity and complexity
F. Port: Shenzhen or Hangzhou