OEM Electrical Connector Mold Parts With Mirror Polishing Processing

Brand Name:Kingrui
Certification:ISO9001:2008
Model Number:KR010
Minimum Order Quantity:1 Pcs
Delivery Time:Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing.
Payment Terms:T/T 50% as deposit 50% before shipment
Contact Now

Add to Cart

Active Member
Location: Dongguan Guangdong China
Address: Building A, No9, Xinxing Road, Shatou South Area, Chang'an Town, Dongguan China
Supplier`s last login times: within 33 hours
Product Details Company Profile
Product Details

OEM Electrical Connector Mold Parts With Mirror Polishing Processing


Product Details


Product nameCustom - Made Connector Steel Mold Parts With Surface Grinding Processing
Precision machineMilling , Grinding, Wire cutting, EDM, etc.
Applied softwareAuto CAD,UG, CAD, etc.
MaterialPD613/H13/BH13/1.2344, etc.
Surface finishPolishing; Zinc/ nickel/chrome/gold plating, Sand blasting&etc.
DimensionAs per customer's request.
Tolerence Precision+/-0.002-0.02mm/ can also be customized
Lead timeBase on the quantity of order( usually 7days)
Quality system100% inspection before shipping
Packing*PE film covered first, Plastic box, then carbon last.
*As customer's specific requirements
ShippingBy sea, By air, By DHL, UPS, FEDEX&etc.
Near PortShen zhen and Hangzhou

Production Capabability


Main Machining Equipments

  • 11 x Surface Grinder
  • 1 x Mitsubishi CNC Wire-Cut
  • 3 x Mitsubishi EDM
  • 2 x Sodick EDM
  • 2 x FUNAC CNC
  • 1 x cnc MILLING
  • 1 x Super Drill
  • 2 x Cylinderical Surface Grinder

Main Measuring Equipments:

  • 2 x NIKON Profile Projector
  • 1 x Mitutoyo Tool-Maker Scope
  • 1 x CMM
  • 6 x NIKON Height Gauge
  • 4 x Mitutoyo Digital Caper
  • 1 x Rockwell Harness Testing
  • 2 x Microscope

Our Services


A: The Japanese materials in our company are purchased from Japan’s first level agent in China. Swedish materials are purchased from China ASSAS and Germany materials are purchased from Shanghai Xinchang with material certificate provided by the first level agent in shipment. Our company believes in the management philosophy of“integrity first


B: The delivery cycle is generally 5~15 working days mainly according to the quantity and the degree of drawing. If it is particularly urgent for you, we arrange urgent order and try to solve problems .for you during the shortest lead time. We would usually use DHL for international in delivery. The clients can usually get the goods at the third day after shipment. If there occurs damage or missing, we will be responsible. In fact, DHL’s service is the best and we basically do not need to worry about it.

C: Please rest assured that all our products are QC inspected and accepted with inspection report before delivery and generally there will no non-conformance; in case of non-conformance, we will have them reworked or repaired at the first time


Our advantage


1. Various types of products;

Procuce fittings with different shapes, material quality, size and tolerances to meet customers' requirements.


2. High-quality and safe product

Give much credit by our customers,Kingrui has provided high-quality products to approximately 500 manufacturing industries world wide.


3.Prompt production and delivery

Regarding the urgent orders, we can finish 3 days.


4. Global Sales System

The products of Kingrui were popular and famous in Japan, USA, Europe and other regions.


China OEM Electrical Connector Mold Parts With Mirror Polishing Processing supplier

OEM Electrical Connector Mold Parts With Mirror Polishing Processing

Inquiry Cart 0