Add to Cart
Customed Cavity Insert CNC Machined Components With Wire EDM
Product Characteristics
1). Surface: according to drawing
2). Lead time: within 5~ 15days (for custom)
3). Material of CNC machined component: PD613, and other materials
SKD61, H13, 1.2344, M2, M4, SUS440B, DC53,etc, can be available.
4). Hardness of CNC machined component: HRC50-52 °
5). Equipments:Surface grinder, EDM machines, wire EDM machines.
Inaddition to these, there are internal -external lapping machines,
cnc milling machines,certerless grinders and so on.
6). Testing: Projector/2.5D/Height Gauge/Micrometer...
7). Custom mould components demand available
Specification of Us
We specialize in non- standard mold parts, precision mold parts,
covering turning, milling, wire EDM cutting,EDM, grinding, etc.
with more than 11 years experience .Please send us drawings or
samples with details technical requirement. We can process mold
parts for customers base on provided drawings.
Main products | CNC milling parts, CNC turning parts, grinding parts, wire EDM
cutting parts,precision mold parts ,EDM spare parts, wire EDM
parts, injection mold parts, core pins and sleeves, and industrial
cutting toolsetc. |
Material available | SKD61/SKD11/H13/1.2344 etc or as your request |
Surface treatment | Mirror Polishing; PVD coating; DLC coating, etc |
Finish | polished, brushed, mirror polished etc. |
Process | turning, milling, wire EDM, grinding, EDM, internal - external
lapping, CNC milling, etc. |
Tolerance | +/- 0.005 mm or customized according to customer's requirements |
Certification | ISO9001: 2008 |
Production capacity | 1200- 1500pcs ,it depends on complexity of different products |
Experience | Precision mold parts machining manufacture from 2005 |
Cooperative partners | Sumitomo (Japan ) |
Packaging | - internal packaging: PP bag, plastic bag, etc - external packaging: carton box, - or as per your requirement |
Lead time | Usually 5- 15 working days (mainly depends on different quantity ) Delivery Time depends on drawing and quantity |
Term of Payment | T/T, 50% as deposit 50% before shipment |
Packaging & Delivery
Packaging Details
1. With Antirust oil and PE film, the rust prevention during
transport.
2. To be packed in plastic and cartons. Prevent vibration and
slide.
3. Use glues tape to seal cartons.
4. Deliver out by DHL,FEDEX Or according to customers' requirement.
Delivery Time
Shipped in 5-15 working days after payment
WHY US?