Add to Cart
Chrome Plated Carbon Steel Hydraulic Piston Rod Cylinder Parts
Proces | CNC Machining |
Material | stainless steel , carbon steel , alloy steel |
Material Grade | GB, ASTM , AISI , DIN , BS, JIS, NF |
Weight | 10g~150kg |
Accuracy | ISO2768-mk |
Surface Roughness | up to Ra0.7~Ra1.6 |
Production capacity | more than 1500MT per year |
Heat Treatment | anneal,quenching,normalizing,carburizing, polishing, plating, painting |
Machining Equipment | CNC center , CNC machines, turning machines, drilling machines , milling machines, grinding machines |
Measuring Tool | CMM , vernier caliper, depth caliper, micrometer, pin gauge, thread gauge , height gauge |
QC system | 100% inspection before shipment |
MOQ | 500kg |
Lead Time | sample fast , lot production depends on customers' request |
Certification | ISO9001 , TS16949 |
Payment Terms | T/T , L/C, D/P , D/A |
Shipment Terms | FOB , CFR, CIF |
OUR ADVANTAGES OF PISTON ROD
1. Our quality is the top five in China. Raw material is mainly
from some famous refinery steel mills, such as BAO STEEL, Tianjin,
and Chengdu etc, which are the best and largest raw material
manufacturers in China. we have been through ISO9001:2000
international quality system certification. Warranty period for our
honed tubes and chrome bars is 2 years. For some special or
important customers, the period is 5 years. All the orders, records
of production and inspection would be kept for 5 years.
2. We own 18 sets of equipment for piston rod in completely
production, producing OD from 12mm to 500mm, at max length of 16m.
Plate according to customers’ different requirements such as
Chrome, Nickel, and Ceramic. Thickness is from 10μm to 100μm.
3. High Precision: Honed tube (Roughness of tube is 0.2μm and
straightness is less than 0.15/1000), piston rod (Plating thickness
is 10-100 micron. Surface roughness is 0.2μm and straightness is
also less than 0.15/1000)
4. Product details are completely according to International
Standard, chrome rod and honed tube must be cut flatly, and no
chrome marks on the surface of rod. (Most of domestic mills don’t
do this in order to reduce cost)
5. Delivery time is very fast. The average delivery time is 5-30
days after confirming the orders. Production output for honed tubes
is about 300tons per month and 200tons for chrome bars per month.
6. Package: our packages are safer than others’ supplier in China.
Packing for rod normally we choose is cardboard that film attached
inside, which does not only prevent rods from scratch but also from
oil rusting. Tubes are made with caps at both end and painted oil
on inside and outside surface. For full container, extra package
like parcel at outside will be used.