PVC flip flop slipper making Machine , Shoe Sole Mould Making Machine With 12/16/20/24/30 Stations

Brand Name:Kingstone
Certification:CE, SGS
Model Number:JL-108
Minimum Order Quantity:1SET
Delivery Time:25-45 DAYS
Payment Terms:D/A, D/P, L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong Province
Supplier`s last login times: within 16 hours
Product Details Company Profile
Product Details

Single Color Flip Flop Slippers Making Machine with 12/16/20/24/30 Stations JL-108


PVC slippers production line.jpg.pdf


Flip Flop Slipper Making Machine for women, men, kids, can make different designs.



Features:


1. By computer, Electrical box, PLC control---more simple, fast and precision.
2. It could be equipped with air blowing system. --- can produce light weight, particularly the need for reinforced cooling effect.
3. Computerization in analysis and design---the machine is well in stability.
4. Conformed to human engineering in design---it features operational compatibility.
5. It could be equipped with servo system. --- can save 30~40% electricity.
6. It could be equipped with cooling system. --- can cooling the mould and extend the mould life.
7. The well-interconnected oil circuit by electric control --- can reduce waiting time, quicken production rate, and promote productivity.


Specifications
Machine modelJL-108
Mould-clamping Unit
Work station12,16,20,24,30
Clamping forceTON80
Opening strokeMM210
Mould dimensionMM600*280
Height of injection nozzleMM280
Injection Unit
InjectorSET1
Screw diameterMM60/65/70
Screw L/D ratioL/D20
Max.injection volumecm3650-1000
Injection speedCm/s10
Screw rotation speedR.P.M0-200
Electricity ConsumptionNormalServo
Heating power of injectorKW77
Hydraulic unit motorKW18.515.7+7.5
Total powerKW25.530.2
Temperature controlSection44
Power consumption per hourKw/h15-207-10
Dimension and Weight24 Stations
Machine dimension(L*W*H)MM4600*3600*2300
Machine weightKGS6000
*Note:Above data only for reference.

Payment Terms


1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.

2. T/T, Westem Union, PayPal, Escow, MoneyGram.


Machine Production Time


25-45 days after confirm deposit.


Packing


Professional export package, plastic film packing, or Wooden case packing.


Shipping


By Sea, One Container for one machine



Samples:



Welcome to Kingstone Machinery!

China PVC  flip flop slipper making Machine , Shoe Sole Mould Making Machine With 12/16/20/24/30 Stations supplier

PVC flip flop slipper making Machine , Shoe Sole Mould Making Machine With 12/16/20/24/30 Stations

Inquiry Cart 0