Add to Cart
Polyurethane Foam PU Sports Shoe Sole Pouring Machine Single / Double Color
JL-298
Features of our PU sports shoe sole pouring machine:
1.Touch screen man-machine interface control panel makes the
machine easy to use ,the operation is
absolutely clear.
2.More accurate measurement; running more stable; no need the
frequency converter, no need to set the
metering pump speed.
3. There are 60 stations in total, the length is 19 meters
including drying tunnel of 16 meters in one side.
4. The heating of drying tunnel can control by electricity or oil,
the temperature can be control by automatic,
running is stable and speed is variable.
5. Full digitalization, modular integrated control all process flow, accurate, safe, intuitive, intelligent.
PU sample manufactured by our machine:
Specifications of Machine | |||
Machine model | JL-298 | ||
Tank quantity | 3 | ||
Tank capacity | L | 120/160/250 | |
Metering pump quantity | 3 | ||
Metering pump speed | rpm | 0-280 | |
Rotating speed of pouring nozzle | rpm | 8600 | |
Cleaing of pouring nozzle | Manual/Auto | ||
Measure precision | ±0.5 | ||
Max.pouring volume | G/S | 90 | |
Rated voltage | V | 3 phase 220/380 | |
Power | KW | 23 | |
Specifications of Moulding Conveyor | |||
Work stations | Stations | 60/80/100 | |
Speed adjustment range of mould table | M/min | 0-20 | |
Mould table dimension | mm | 600*500/500*500 | |
Metering pump speed | rpm | 0-280 | |
Rotating speed of pouring nozzle | rpm | 8600 | |
Heating Mode | Electricity/oil | ||
Power | KW | Electricity 36/49.5/61.5 Oil heating 4/5.5/5.5 | |
Dimension | MM | 19000/25000/30000*2000*1500 | |
*Note: Above data only for reference. |
Why Choose KINGSTONE?
1. To share our 30 years experiences with our respected customer.
2. To supply whole production line for making shoes (Include Machine, Mould, Material).
3. To support our customer on Factory Building, Factory Management, Production & Package for Shoes, Sales Layout, Market Development.
4. To service customer with machine operation and maintenance.
5. To solve the problem quickly and efficiently on the after sales service.
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before
shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case
packing.
Shipping
By Sea, One Container for one machine
Delivery Terms
As per request: EXW, FOB, CIF for your option;
Guarantee
2 years. We provide 2 years guarantee time for all of our machine,
it’s the longest time in China.
Machine Details:
FAQ
1. Are you manufacturer?
Yes, we are manufacturer for shoe making machine and shoe mold.
Welcome to visit our factory!
Address: Huarui Industrial Park, Hengjiang Village, Chashan Town,
Dongguan City, Guangdong P.R.C
2. What do you think of the quality of your machine?
The boss start machine business many years, so he know the quality
for machine is very important. From Kingstone Machinery Beginning,
we stressed the high quality of machine to win a good reputation.
We are confident with our machine.
3. What's the price of your machine?
The price of our machine is not lowest, but competitive. We stress
the machine quality, so the spare parts of our machine is made from
international brand. With it, we keep high quality and competitive
price.
4. Can you provide the machine detailed information and video?
Yes, we can provide the detailed information of machine and video
to you if you want it.
5. Can we see the machine working while I come your factory?
Yes.
6. What do you think the different between your machine with other
machines?
That's a good question.
First, the spare parts is different. Ours is made from
international brand, others is made from domestic factory. The
function has a big different. That is why other machines can
provide lower price.
Second, the conformation of the machine. According to the height of
people, we adjust the height of the machine, now it's convenient to
put the mold and take the shoes from the mold for everyone.
Third, the performance of the machine. Previous machine will waste
some materials in the working process. Now we make changes and
reduce this kind of waste. It will help our customers to reduce the
cost.
.....
7. How about the delivery time?
The delivery time is about 30-45 days. Because we need arrange
production line, and after finished, we need test the machine some
days. If you are urgently, we can try our best to arrange the
production.
8. Will your company will send the technical workers to my factory?
Yes, we will send our technical workers to your factory and install
the machine and teach your workers how to operate the machine. But
your factory need arrange the living and food.