

Add to Cart
PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle
Filling
Product Description
1. The main machine adopts advanced PLC control technology. The key
parts adopt international famous products,such as Mitsubishi,
Omron, Siemens, etc .
2. Low overall machine noise.
3. All parts are made of high quality Stainless steel.
4. Magnetic powered cap device ensures tightness and prevents
damage of the caps.
5. Built-in safeguard mechanism ensures the safety of operator and
machine.
Product Name | CGF16-16-6 Filling Machine |
Material | stainless steel 304 |
Filling heads | 16 |
Washing heads | 16 |
Capping heads | 6 |
Suitable bottle | PET bottle, Plastic bottle |
Weight | 4000KG |
Main motor power | 3KW |
washing system | filling system | capping system |
<1>All 304/316stainless steel rinse heads, water spray style
inject design, more save water consumption and more clean <2>304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing <3> 304/316 stainless steel washing pump | <1> 304/316 Stainless steel high precision filling nozzle <2> Filling volume adjustable in fine rank, same liquid level after filling <3> All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean <4> 304/316 stainless steel filling pump | <1> Place and capping system, electromagnetic capping heads,
with burden discharge function, make sure minimum bottle crash
during capping <2> All 304/316 stainless steel construction <3> No bottle no capping <4> Automatic stop when lack of bottle |
Our Service
1. Installation and Adjustment:
After the equipments are arrived at the customer’s site, the
customers is responsible for unpacking and arranging the equipment
according to the placement drawing; and do under our install-adjust
technicians’ guidance.
According to requirement of water, electricity, air and steam
consumption and the demands of quality level and pipeline, the User
should connect the wire, cable and pipe of water, air and steam to
the special position ordered in the installation area of production
line ahead of time. Other relevant matching equipment and project
should be finished before we adjust our equipment.
We’ll bring a suit of portable installation and adjustment tools
ourselves during the period of installing and adjusting, the other
instruments we need should be furnished by the customer for free
including oxygen, acetylene angry, argon, etc. needed in the
installation and adjustment site.
The customer should dispatch the capable person to accept training
in the installing site.
2. Training :
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipments, control and operation of the equipments. The training
lessons are finished in the process of installation and adjustment.
Through training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time.
3. Quality Assurance:
We guarantee the goods offered are brand-new, unused, with latest
design and suitable material made, and we guarantee the
specification of the equipments is consonance with the contract.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc that all belong to our
responsibility.
4. Maintenance :
Offer 24 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.