Add to Cart
Half Round Rain Water Gutter Roll Forming Machine For Building Material
1. The advantage of water gutter cold roll forming machine
gutter cold roll forming machine can bend the roll formed pipe, and let the drainpipe and the bending connect to be the whole.The product after roll forming has long working time than the tranditional ppc pipe, and not aging. It can make the project more integrate, and help to enhance the image of the all project.
2. Parameter
Item | Parameters | |
According to buyer's requirements | ||
Raw material | Type | PPGI, PI, CR , Steel Coil, or equivalent |
Thickness(mm) | 0.3-0.8 | |
Width of the feeding material | According to buyer's final confirmed profile drawing | |
Yield strength(Mpa) | 230-550 | |
Forming speed(m/min) | 0-18 | |
Roller material | 45 # sheet with chrome coated | |
Roller driven type | Chain transmission | |
Control System | PLC (Panasonic) as list in the note | |
Operation type | Touch screen + button | |
Hydraulic system pressure( MPa ) | 12 | |
Hydraulic motor power ( KW ) | 5.5 | |
Main motor power(KW) | 2 * 5.5 | |
Shaft Material and DIA | 65mm, material is 45 # forge steel | |
Electric Source | 380V, 50HZ,3 phase According to customer’s require | |
Roller stations | 16 | |
Dimension(L*W*H) | Forming Section about 7m*1.8m*1.2m |
3. Machine List
Manual decoiler ( 3 Ton ) | 1 unit |
Main Roll Forming Machine | 1 unit |
Cutting Device | 1 unit |
Electrical System with PLC Control | 1 unit |
Hydraulic station | 1 unit |
Out table | 2 unit |
- Steel gutter machine is for processing 0.5mm thickness color steel. Actually the thickness can be up to 0.8mm. It is half round profile to be used together with downpipe.
- For the steel gutter machine, there are 16 roller stations for roll forming machine, adopts hydraulic cutting type, can cut to any length automatically. Together with the machine, the whole production line also include one decoiler and one output table.
5. Our Service:
Installation (optional by the buyer)
a.After the machine arrives at the destination, the seller will send technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.
b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technicians departure): 5 days
c.The buyer pays the installation charges to the seller’s
d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)
e.The buyer pays the seller’s technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.
f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
6. Finished Product photo for Reference: