H20 Beam Automatic Climbing Formwork 5.40m Working Height Movable Horizontally

Brand Name:HORIZON
Model Number:HORIZON CLIMBING SYSTEM
Minimum Order Quantity:50 sets
Delivery Time:20-25 days
Payment Terms:L/C, T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Jumping Formwork System Lifted by Crane For High-rise Wall Construction


Climbing Formwork CB240 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.

1. Climbing bracket


2. Main platform


3. Pouring platform


4. Finishing platform


5. Roll-back system


6. Push-pull prop


7. Vertical waling


8. Anchor system


9. Formwork


China H20 Beam Automatic Climbing Formwork 5.40m Working Height Movable Horizontally supplier

H20 Beam Automatic Climbing Formwork 5.40m Working Height Movable Horizontally

Inquiry Cart 0