

Add to Cart
3 Phase Movable Smart Resistance 300KW-400V Generator Load Bank
Fullde Power generator intelligent testing system can accurately test the output power and loading capacity of various generator units,test all the electric parameters including dynamic parameters of generator units,and mainly include two parts: testing control and load cabinet,which is used in coordination with host computer thus materializing intelligentization and automatization to complete the testing of all electric parameters of generator unit,meanwhile,charts,curves and testing report are produced,and no manual operation is required(intelligently controlled,manual/automatic may be selected),to provide scientific testing means for large power generator units.
Testing function:
1. Parameter display and measurement:
Control panel contains Multifunction Electricity Meter displaying
voltage, current, load power, reactive power, apparent power, power
factor, frequency etc.
2. Load bank use premium components to ensure reliable performance
and longer service life including:
Switch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens;
3. Vltage and frequency setting testing, fluctuation testing,
transient testing functions, can automatically test maximum and
minimum,values of voltage,current and frequency as well as
restoring time when testing load changes suddenly;
4. May automatically produce various charts, testing reports,can be
signed and change the format according to customer's requirments;
5. Testing reports may be inquired, displayed and printed based on
time, model, machine number,the minimum resolution time of stable
state record is 1s, transient;
6. When testing,the rated power and loading time of generator unit
tested may be input,the system will automatically complete the
loading test from
0,25%,50%,75%,85%,90%,100%,110%,100%,90%,85%,75%,50%,25%,0 strictly
according to the state standard,store and display the
changes,restoring time and curve of V,I,KW,Hz of generator when
loaded in the form of format and sketch,the tested points may also
be configured manually;
7. Load/unload with one key: Whether manual control, remote control
or software control, user can preset the power, then press load
master button. Load bank loaded according to preset power to avoid
load fluctuation during the power changing.
Technical Parameters for reference:
System components | Load bank, resistive load,data collection, automatic control and manual control, electrical control, cooling devices and auxiliary control,Industrial machines, printer. |
Total discharge power | 300KW |
Resistive load stalls | step: 5KW |
Test voltage | Three-phase AC400V |
Test Frequency | 50Hz |
Resistance tube | Insulation resistance of each resistor above DC500V 100MΩ , Pressure AC2000V 1 minute, Resistance to high temperature. |
Load connection | Star (three-phase four -wire) |
Loading precision | ±3%; |
Work way | Continuous work |
Working power | 480VAC/50Hz/Three-phase four-wire system; (reservation terminals) |
Operator terminal | IPC / software, full realization of automated control |
Control mode | Manual control / computer software auto control |
Measured Control Function | Load subtraction control, extended load automatic identification synchronization control |
IPC detection function | I, V, HZ, KW, COSΦ etc.Real-time display, electrical performance testing, curves and report output, system electrical parameters monitoring, automatic data acquisition; |
Parameter record | Form through EXCEL, curves pictures saved by WORD document |
Parameter display | three-phase voltage, three- phase current, apparent power, active power, reactive power, power factor, frequency, etc.; |
Load protection | Overvoltage, overcurrent, high temperature, air flow and fan failure protection; |
Fault alarm | Fan failure, load high temperature alarm |
Dimension | 1100*1300*1600 |
Weight | 450kg |
Applicable Scope | For marine diesel generator sets, land diesel generators, power inverters, UPS systems |
Shipping: