Grivory GV 5HL Injection Mold Tooling 15 Square Flange 1 Set Iinterchangeable Insert Tool

Brand Name:No brand
Certification:ISO 9001:2008
Model Number:No model
Minimum Order Quantity:1 pc
Delivery Time:5 weeks
Payment Terms:T/T. Mould payment terms: 40% Deposit with P.O., Middle Term(first trial)30%, Final Term(before shipment)30%. Production payment terms: 50% Deposit with P.O., Final Term(before shipment)50%.
Contact Now

Add to Cart

Active Member
Location: Shenzhen Guangdong
Address: Block A1, Xingfu Lantian technology zone,Tangxia Yong, SongGang Town, Bao'an district, Shenzhen, China
Supplier`s last login times: within 35 hours
Product Details Company Profile
Product Details

Grivory GV 5HL Injection Mold Tooling 15 Square Flange 1 Set Iinterchangeable Insert Tool


Project Detailed Description :

Mold Number:NTT-210-34
Part Name:15 Square Flange
Part No.:120214-WG-15
Core and Cavity:1.2344(H13)
Slides:4 slides
Cavity Numbers:two cavity
Injection System:cold runner/tunnel gates
Mould Life:800,000 Cycles.
Resin Name:Grivory+GV-5HL
Shrinkage:1.012
Molding Cycle Time:50s
Tool Dimensions:300x400x300 mm
Mold Weight:370 kg
Features:1 set cavity interchangeable insert.
Machine:350T
Mold Lead Time:5 weeks

Mold Pictures:
Engineering & Design
3D Modeling:
Pro/ENGINEER , SolidWorks, Unigraphics.
2D Drawing:
Auto-CAD, E-drawing

Project Process:


RFQ

Quotation

PO

DFM

Mold Design

Design Approved

Steel Ordering

Machining

Mold Trial

Sample Approved

Texture

Delivery


NTT Mould:

Main BusinessHigh-quality plastic injection molds, injection molding, & part assemblies.
Serve IndustriesAutomotive, electronics, home & office appliances, medical, etc.
Markets90% molds exported to North America, South American, Europe and Australia.
Complex structureHot runner mold, over mold, two-shot mold, unscrewing mold, multi-cavity mold, etc.
QualityStrictly comply with ISO 9001, and use quality document system to control every process of design, production and inspection.

Qualified Suppliers:

We work with qualified suppliers, and source mold base and mold steel from LKM, ASSAB, THYSSEN and DAIDO; hot runner system from YUDO, MOLD-MASTER, HASCO, DME, HUSKY.

If you make mold with us, our engineer will follow up your project from beginning to end:


1. Before mold build, a rough layout of the mold design (DFM) can be sent as a PPT format.



2. After you approve the DFM, we would give you a full detailed mold design in 2D and 3D drawing.



3. Once the mold design approved, we will start to build the mold strictly according to your requests.

Every week, we will send you weekly report with components (electrode, cavity, core, mold base) picture to show you the process of the project.



4. When we make T1 samples, we will make a video to you, and also send samples with molding report for your approval.



5. Only everything of the mold and sample is confirmed OK from your side, we will arrange the mold shipment and send you mold inspection report as well.


We take carefully with every step to make sure our quality, and what we can do, we surely try our best to work on it.


We are always available to answer your questions if you need additional information. Call us now, we look forward to partnering with you as your supplier.

China Grivory GV 5HL Injection Mold Tooling 15 Square Flange 1 Set Iinterchangeable Insert Tool supplier

Grivory GV 5HL Injection Mold Tooling 15 Square Flange 1 Set Iinterchangeable Insert Tool

Inquiry Cart 0