16 Cavities PP Hot Runner Mold 1.2767 Steel Plastic Cap Insert 2 Percentage

Brand Name:No brand
Certification:ISO9001:2008
Model Number:No model
Minimum Order Quantity:1 pc
Delivery Time:4-7weeks
Payment Terms:T/T. Mould payment terms: 40% Deposit with P.O., Middle Term(first trial)30%, Final Term(before shipment)30%.
Contact Now

Add to Cart

Active Member
Location: Shenzhen Guangdong
Address: Block A1, Xingfu Lantian technology zone,Tangxia Yong, SongGang Town, Bao'an district, Shenzhen, China
Supplier`s last login times: within 35 hours
Product Details Company Profile
Product Details

16 Cavities PP Hot Runner Mold 1.2767 Steel Plastic Cap Insert 2 Percentage


Specifications


Part NameCAP INSERT
Part NumberNTT-603-10-4
Drawing Number10094103
MaterialPOM(COLCON M90)
No. of Cavities1x4
Mold standard1.2767
Injection SystemHot runner
Shrinkage1.002
Part ColorWhite

Our qualified suppliers, source mold base and mold steel are from LKM,ASSAB,THYSSEN and DAIDO; hot runner system from YUDO,MOLD-MARSTER,HASCO,DME,HUSKY. We also can select international standard component from LKM,DAIDO,HASCO and DME, to provide compatible standard component to help customer cost down.


Our Mold flow:
1. Received inquiry,Quoted within 24hours, Confirmed order
2. Received PO, samples or drawings& begin to make mold design
3. Send you design drawing and get confirm message,arrange purchase steel
4. Manufacture : surface shaping, drill, CNC, high speed carve, wiring-cutting, EDM, rough polish etc. Assemble mold
5. 1st test mold, and send samples to customer to comfirm.
6. Modify the mold according to customer's feed back on 1st testing samples.
7. After sample confirmed, pacakge the mold, arrange mold shipped.
As soon as mold job start, we will provide time plan, and inform custom 1st testing time.
Every Monday, provide weekly report contains weekly photos.


Our professional project management teams can communicate with you in English fluently, control every details during whole design & manufacturing process. Project manager will be fully in charge of all projects and technical communication with customers. Keep close working relationships with our customers: The better we understand your molding requirements and objectives, the better we can serve you.

Weekly report and digital picture are presented customer the detail project progress status, it is easy for customer to control everything at the same time. All the teams are organized under a sole management structure to enhance the best coordination and efficiency.



Questions & Answers:

  1. How many molds could you make every month?
    35-40 SETS

  2. How about the largest mold you ever made?
    1400mm*1100mm*1000mm and 10 tons

  3. How about the tolerance?
    Mold tolerance 0.005 mm, Product tolerance 0.02 mm

  4. What’s the percentage of automobile molds you made, what’s the brands?
    About 40% of total molds are for automobile.
    TOYOTA, HONDA, JAGUAR, BMW and BUICK.

  5. Have you ever made over mold? What kind of materials you use?
    We have good experience in over mold of ABS+PC,PA+TPE,ABS+TPE,TPE+TPE.

  6. How about the steel you usually use?
    We only use raw materials with good quality and origin certificate.
    We use steel of P20, P20H, 718H, NAK80, 1.2311, H13, 1.2344, 420SS, S136, S-7 and 1.2767. They are all from famous suppliers, such as LKM, ASSAB, THYSSEN and DAIDO.

  7. How about the standard components you use?
    We only use standard components from brand supplier like LKM, DAIDO, HASCO, DME.

Product Picture:

China 16 Cavities PP Hot Runner Mold 1.2767 Steel Plastic Cap Insert 2 Percentage supplier

16 Cavities PP Hot Runner Mold 1.2767 Steel Plastic Cap Insert 2 Percentage

Inquiry Cart 0