Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated

Brand Name:forster
Certification:CE/TUV/ISO9001/From-E
Model Number:CJ13
Minimum Order Quantity:1 Set/Sets
Delivery Time:90days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Mini Hydro Turbine Pelton Generator For Hydro Power Plant


Our main products included:


1. Kaplan turbine generators series.


2. Turgo turbine generators series.


3. Tubular turbine generators series.


4. Francis turbine generators series.


5. Pelton turbine generators series.


Product features:


The impact turbine is a special hydraulic propulsion mechanism that draws a free jet with kinetic energy, rushes to the runner bucket, and rotates the runner to do work, thereby completing a hydraulic prime mover that converts water energy into mechanical energy. In the impact turbine, the difference between the working jet and the relative position of the runner and the number of work can be divided into a tapping turbine, a slanting turbine and a double-click turbine.

1.suitable for high head,small flow and flow changes in large runoff hydropower station.


2.With the power plant investment is small,compact units structure characteristics.


3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.


4.Suitable for high head,small flow station in mountainous area.


5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.


Product parameters:


CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Runaway speed(r/min)Vavel controlGuide vane controlDiameter (mm)
Flow rate (m3/s)The output(kw)
CJ237-W-65/1x7.5500.13453410557501500Direct connection or Belt connectionautomatic/ManualZ41H-2.5300
600.14869.7150557501500automatic/Manual
700.15989.8486757501650
800.17108520100500900automatic/Manual
900.1811295501256001080
1000.191525801256001080automatic/Manual
1100.1991746101606001080
1200.2081976362006001080automatic/Manual
1300.2142206622006001350
1400.2252506882507501350automatic/Manual
1500.2332797132507501350
1600.2413087363207501350automatic/Manual
1700.2483557583207501350
1800.2543627793207501350automatic/Manual
1900.2623908004007501350
2000.2694228204007501350automatic/Manual
2100.2754488404007501350
2200.2824488604007501350automatic/Manual
2300.28851888050010001800
2400.29455790050010001800automatic/Manual

Product pictuers:


Installation picture:


Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?



China Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated supplier

Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated

Inquiry Cart 0