

Add to Cart
BWRBWST Stepper Microcomputer Hydro Turbine Governor For Hydro
Power Plant
Main Products:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
The BWRBWST stepper turbine governor replaces the traditional
electro-hydraulic converter with a stepper motor driver and a
stepper motor, eliminating the swivel motor speed mechanism and
buffer for easy access and maintenance. Due to the use of software
frequency measurement, it overcomes many defects of the hardware
frequency measurement circuit and makes full use of the advantages
of programmable high reliability. Therefore, the stability is good,
and the operation is very clear due to the use of the Chinese touch
screen display, the running state, the parameter setting, etc.
Convenience.
The state monitoring of the turbine governor is mainly to realize
the real-time monitoring of the state of the governor through the
computer, and to master the operating state of the equipment,
mainly including various detection, measurement, monitoring,
analysis, and discriminating methods, combined with the history and
current status of the system, and comprehensive consideration of
environmental factors. Evaluate the running status of the
equipment, determine whether it is in a normal state, display and
record the status, and make an alarm to the abnormal status so that
the operating personnel can process it in time to provide basic
data for equipment failure analysis, performance evaluation,
rational use and safe work. . The typical turbine system speed
control system condition monitoring system mainly includes four
major components: 1 sensing and transmitter; 2 governor control
cabinet; 3 industrial computer and man-machine interface; 4
background integrated diagnostic monitoring system Distributed
structure, various sensors are installed on the monitored
equipment, the governor control cabinet is responsible for data
acquisition, and performs general data processing, conversion and
alarm, and communicates with the industrial computer through
communication. The industrial computer is responsible for complex
data processing and storage. Based on the unified information
platform, it realizes the collection of state data of the turbine
unit adjustment system, feature calculation, real-time monitoring,
fault recording, performance test data record, and comprehensive
online diagnosis and status of the background unit. The maintenance
assistance decision system provides a reliable source of data.
1. measure the frequency of the unit and the power grid, and
realize the frequency regulation of the unit when it is running
without load or in isolation;
2. when no load is on, the unit frequency automatically tracks the
power grid frequency, which is convenient for rapid automatic
synchronization;
3. manually start and stop, increase and decrease load, and operate
with load;
4. automatically start and stop the machine, and automatically
adjust unit output according to permanent slip (bp) after grid
connection;
5. switch automatically and manually unconditionally and without
disturbance;
6. main parameters and operation status of speed regulators such as
machine frequency, network frequency, guide blade opening, manual
and automatic are displayed on the display screen;
7. able to set the operating parameters of the governor through the
display screen;
8. when an electrical fault is detected, it can be automatically
cut to manual and the load can be fixed in the state before the
fault.
9. high reliability programmable controller (PLC), small size,
strong anti-interference ability, and an average trouble-free time
of more than 300,000 hours;
10. software frequency measurement can meet the requirements of
timing and accuracy of frequency measurement;
11. PID intelligent control, with good stability and adjustment
quality
Product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com