

Add to Cart
Fully automatic GSZWT Microcomputer Hydraulic Governor For Hydro
Turbine Gennerator
Main Products:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
As an important part of the turbine, the turbine governor is
extremely complex and directly affects the operation of the
turbine. Hydropower
Turbine governor.
In the operation of the station, in order to ensure the normal
operation of the turbine, it is necessary to ensure that the
functions of the turbine governor can function normally. Based on
this, when using the turbine, the turbine governor should be
commissioned to support the normal and stable operation of the
turbine. In order to ensure the commissioning effect of the turbine
governor, the relevant staff should have a certain understanding of
the working principle of the turbine governor, and must master the
corresponding debugging techniques, methods and processes,
preferably with certain turbine governor debugging experience. In
order to better carry out the commissioning of the turbine
governor.
Commissioning of the turbine governor can be done in two steps,
namely experimentation and testing. When commissioning the turbine
governor, the relevant personnel should first perform static and
dynamic experiments on the turbine to detect all aspects of the
turbine governor during use, thereby regulating the turbine. The
normal use of the device provides protection.
Hydraulic machine speed as an important equipment of power plant, played a key role for the normal operation of the hydropower station, and hydropower station can normal power work are inseparable, once the governor fails, will directly related to the turbine units, and the safe and stable operation of power system, so the hydropower station workers attach great importance to the debugging and maintenance of turbine speed, timely commissioning, maintenance, maintenance of turbine speed, to the greatest degree of avoid turbine speed problems, to guarantee the normal work of the hydropower station.
1. measure the frequency of the unit and the power grid, and
realize the frequency regulation of the unit when it is running
without load or in isolation;
2. when no load is on, the unit frequency automatically tracks the
power grid frequency, which is convenient for rapid automatic
synchronization;
3. manually start and stop, increase and decrease load, and operate
with load;
4. automatically start and stop the machine, and automatically
adjust unit output according to permanent slip (bp) after grid
connection;
5. switch automatically and manually unconditionally and without
disturbance;
6. main parameters and operation status of speed regulators such as
machine frequency, network frequency, guide blade opening, manual
and automatic are displayed on the display screen;
7. able to set the operating parameters of the governor through the
display screen;
8. when an electrical fault is detected, it can be automatically
cut to manual and the load can be fixed in the state before the
fault.
9. high reliability programmable controller (PLC), small size,
strong anti-interference ability, and an average trouble-free time
of more than 300,000 hours;
10. software frequency measurement can meet the requirements of
timing and accuracy of frequency measurement;
11. PID intelligent control, with good stability and adjustment
quality
Product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com