Metal Volute Inclined High Head Water Turbine Generator Easy To Install

Brand Name:forster
Certification:CE/TUV/ISO9001/From-E
Model Number:XJ02-W-50/1*11
Minimum Order Quantity:1 Set/Sets
Delivery Time:120days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Easy To Install And Easy To Install Stainless Steel Runner Metal Volute Inclined Hydro Turbine Generator For Sale


Our main products included:


1. Kaplan turbine generators series.


2. Turgo turbine generators series.


3. Tubular turbine generators series.


4. Francis turbine generators series.


5. Pelton turbine generators series.


Product features:


When the slanting turbine is working, the water flows from the pressure water pipe through the nozzle to form a high-speed jet, and the jet and the runner plane impact the rotor blade in a 22.5° direction. After the work is done, the Water flows out from the water outlet of the vanes and drains along the tail water channel to the downstream.


In order to ensure free flow of the jet, the turbine runner must be installed above the water level of the tailrace, and the runner should be no less than 0.5m from the water level of the tailrace.


Water energy is converted into mechanical energy
The operating parameters describing the turbine are head (H meters), the operating parameters describing the turbine are head (H meters), the parameters describing the water energy are head (H meters) and flow rate (Q meters 3 / sec). Flow rate (Q meters 3 / sec), power (N kW), speed (n rev / min) and efficiency (η%).


The water flow hits the vane, and the vane changes the direction of the water flow, that is, the force of the vane feed water. According to the law of action reaction, the water flow gives a reaction force to the vane. The vanes to rotate around the axis, which drives the generator or other processing machinery. This is the process by which water can be converted into mechanical energy.


1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.


2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.


Product features:

XJ02-W-50/1 x 11 turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorThe runaway speedRated speed(r/min)manuallyautomaticModeldianeter
Flow rate (m3/s)The output(kw)
XJ02-W-50/1 x 11450.27196.7537756001080direct connectionmanuallyYTT-35Z4.H-1.6C350
500.286113.25661006001080////"〆/"
550.296130.65931256001080//////////
600.313148.96201256001080//////////
650.326167.96451606001080//////////
700.338187.66691606001080//////////
750.35208.16932006001080//////////
800.361229.27162006001080//////////
850.372251.17382507501350//////////
900.383273.57592507501350//////////
950.394296.67802507501350//////////
1000.404320.48003207501350//////////
1100.424269.68393207501350//////////
1200.443421.28764007501350//////////

Product pictuers:


Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.


Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.


Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.


Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.


Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.


Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.


Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com



China Metal Volute Inclined High Head Water Turbine Generator Easy To Install supplier

Metal Volute Inclined High Head Water Turbine Generator Easy To Install

Inquiry Cart 0