Automatic Hydro Power Generator Water Power Plant With Remote Control

Brand Name:Forster
Certification:ISO9001/CE/TUV/From-E
Model Number:CJA237/475-W-90
Minimum Order Quantity:1 SET
Delivery Time:12 0work dayes
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Automatic Hydro Power Generator Generator Water Power Plant With Remote Control


Our main products included:


1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.


Automatic Pelton turbine Product features:


In automatic pelton turbine, according to the relative position of working jet and runner and the number of times of work, it can be divided into: cut-impact turbine (bucket type, the most widely used) inclined-impact turbine double-stroke turbine 2, impact turbine and counterattack turbine

I.the working principle and counterattack turbine of the same point impact turbine The percussive turbine transmits the energy of water flow to the runner by the principle of interaction and reaction between water flow and runner blade, which releases the mechanical energy from the runner rotation. Main Types and Working Characteristics of Impulse Turbines

II. Similarities and Differences between Impulse Turbines and Counter-Impulse Turbines

III. Structures and Main Working Components of Cut-Impulse Turbines I. Main Types and Working Characteristics of Impulse Turbines. Automatic pelton turbines are free injection of kinetic energy by means of special guiding mechanisms (nozzles). Flow, rush to the runner bucket, make the runner rotate and do work, thus completing a hydraulic prime mover that converts water energy into mechanical energy.


1, Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .


2, Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle


3, Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.


4, Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.


5, Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .


Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.


Automatic pelton turbine product parameters:

Pelton tubine generator unitGeneratorUnit output (kw)
Turbine
TypeWater head(m)Discharge (m³/s)Output(kw)Speed (r/min)TypeCapacity (kw)
CJA237/475-1*72000.232383.2750SFW320-8/850320358.3
2200.243440.5SFW400-8/850400414.1
2400.254502SFW500-8/850500474.4
2600.2645721000SFW500-6/850500540.5
2800.274643.5SFW630-6/990630608.1
3000.284714.6SFW630-6/990630675.3
CJA237/475-W-90/1*4.52750.086176.3750SFW160-8/650160162.9
3000.0896200.4SFW200-8/740200185.8
3250.0932225.8SFW200-8/740200209.3
3500.0969252.8SFW250-8/740250235.1
3750.1005279.8SFW250-8/740250260.2
4000.1033091000SFW250-8/740250287.4
4250.1077341.3SFW320-6/740320320.1
4500.1098368.4SFW320-6/740320345.5
5000.119496SFW500-6/850500456
6000.131650SFW630-6/990630610
7000.141823SFW800-6/990800770
CJA237/475-W-90/1*72600.261572750SFW500-8/850500526
2800.271636SFW630-8/990630585
3000.28700SFW630-8/990630651
3200.289766SFW800-8/990800712
3400.298834SFW800-8/990800775
3600.307899SFW800-8/990800836
3800.315968SFW1000-8/11801000900
4000.32710931000SFW1000-6/118010001021.9
4200.3351159SFW1000-6/118010001189
4400.3431287SFW1250-6/118012501203.3
4600.3511382SFW1250-6/118012501292.2
4800.3591476SFW1250-6/118012501380.1
5000.3661567SFW1600-6/118016001465.1

Automatic pelton turbine product pictures:

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com

China Automatic Hydro Power Generator Water Power Plant With Remote Control supplier

Automatic Hydro Power Generator Water Power Plant With Remote Control

Inquiry Cart 0