

Add to Cart
Unshielded SMT RJ45 Ethernet Connector 10/100Mbps Surface Mount Jack |
Product Specification:
Specification: | SMT RJ45 Connector | Cross Part NO: | SMT-18801XXXXX-86 |
Mounting: | Thru-hole R/A | Samples: | Available 2-3 Pcs |
Latch: | Tab down | Files: | PDF/3D/ISG/Stp/Step/Datasheet |
Product Details:
1. Current Rating | 1.5A |
2. Voltage Rating | 125v |
3. Contact Resistance | 30milliohm Max |
4. Withstand Voltage | 1000V AC 50Hz or 60Hz,1MIN. |
5. Insulation Resistance | 500 MΩ MIN @ 500V DC. |
6. Mating/Unmating Force | 2.2KG.F MAX. |
7. Retention Strength | 7.7KG.F MIN Between Jack And Plug |
8. Operating Life | 750 Cycles MIN. |
9. Operation Temperature | ﹣40℃ to +85℃ |
10. Storage Temperature | ﹣40℃ to +85℃ |
11. Housing Material | LCP |
12. Contact Material | Phosphor Bronze |
13. Contact Mating Area Plating | Gold/3u"/6u"/15u"/30u" |
why choose us?
100% Guarantee Quality
· Free samples (excluding freight charge)
· 10 years experience for RJ45, RJ11, RJ12.4.Within a period of 12 months from the date of shipment.
· Manufactured Under Strict Controls.
· Online technical support.
· Factory evaluation anytime.
· 100% Tested before shipment.
Our advantage
1. Short lead time: 7~10 days under 50k pcs.
2. High quality with competitive prices.
3. Free samples can provided.
4. Good service to each customers.
CSCE Connection of the principles
>To care for health and safety of employees as corporate responsibility,all production activities must give priority to employee’s safety and health.
>To control the production process effectively and abide by law and meet customer’s requirements.
>Focus on customer’s normal needs, with high quality high efficiency management to provide high quality service and products.
>Save resources,lower energy consumption. Reduce environmental pollution caused by production.
>Abide by law.
Continuous improvement, sustainable operation.
Our Services
1) Your inquiry will be replied within 12 hours.
2) We provide OEM, ODM service, the details of the product can be made as your requirement.
3) Excellent before service and after service.
FAQ
1. When will you ship the goods out if i send payment now?
Usually ,We will delivery out them 2-3 Week later after payment
received.if the PO is very big ,we need more time to produce .
2. Is your goods tested before shipping?
Yes,we test every item at least 3 times before shipping,please do
not worry about the quality problems,you can buy with confidence.
3. I am new buyer ,how can i buy from you?
You tell us what you need ,we send you offer,if you think the offer
is good,our sales send you company invoice including all details
such as payment terms etc ,then we ship to you.
Product Drawing: