Steel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop

Brand Name:Ruly Steel
Certification:SGS, BV
Model Number:Ruly0131
Minimum Order Quantity:500 Square Meter
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Tieshan Industrial zone, Huangdao District, Qingdao City.
Supplier`s last login times: within 40 hours
Product Details Company Profile
Product Details

Steel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop


This is a Steel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop. It is built to park and maintain helicopter.


It is a portal frame structure hangar. Welded H-section steel beams and columns are connected by high strength bolts to be the main frame structure. Portal frame structure building could provide large space and stable structure.


Our service for such project include designing, fabrcation all the steel structure components and roof & wall insulation material, installation.


Project information for this portal frame structure hangar:

NameSteel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop
Structure Typeportal frame, single ridge, three span
Length130m
Width80m
Eave Height10m
Roof Slope10%
Gable Wall Column Spacing7.5m
Roof

75 mm Glass wool sandwich panel

Wall75 mm Glass wool sandwich panel
DoorSliding door
WindowRibbon Skylight
Height difference between indoor and outdoor300mm

Main parts of the steel structures and technical parameters:

Main Steel Frame System
Main structureH section steel Q355, alkyd painting, two primary painting, two finish painting.
Roof purlinXZ160*60*20*2.5, galvanized
Wall purlinXZ160*60*20*2.5, galvanized
Intensive boltGrade 10.9
Turn buckle boltM20+2, steel Q235, processing
Anchor boltM24, steel Q235, processing
Ordinary boltGalvanized bolt M20
Ordinary boltGalvanized bolt M12
Brace nutGalvanized bolt M12
Bracing System
Cross braceΦ20 round steel bar Q235, process and painted (alkyd painting)
Angle braceL50*5 angle steel Q235, process and painted (alkyd painting)
Column bracingΦ25 round steel bar Q235, process and painted (alkyd painting)
Tie barΦ127*3 steel pipe Q235, process and painted (alkyd painting)
Batter braceΦ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting)
Wall & Roof System
Roof panel75 mm Glass wool sandwich panel
Wall panel75 mm Glass wool sandwich panel
Edge cover0.5mm color plate, angle Alu.
Fittings & accessoriesNails, glue etc.
Unpowered ventilatorDiameter Φ600, stainless steel
Sky lighting band1.2mm FRP, double layer
Sliding doorsandwich panel door
Roof drainage system
Gutter0.5mm color steel plate
Rainspout pipesΦ110 PVC pipe

Our steel structure fabrication factory:


Our service:

1. Structural steel fabrication, painting , galvanizing , pre-assembly

2. Designing, fabrication and installation for Prefabricated steel structure building.

3. Deepen or design the fabrication drawing or shop drawing based on your architectural drawing and construction drawing

4. Engineering consulting service


Packing and transport:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.


How to quote:

The following question we need to know before making the price. Just feel free to fill what you know.

1Location (where will be built?)_____country, area
2Size: length*width*height_____mm*_____mm*_____mm
3wind load (max. wind speed)_____kn/m2, _____km/h, _____m/s
4snow load (max. snow height)_____kn/m2, _____mm
5anti-earthquake_____level
6brickwall needed or notIf yes, 1.2m high or 1.5m high
7thermal insulationIf yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8door quantity & size_____units, _____(width)mm*_____(height)mm
9window quanity & size_____units, _____(width)mm*_____(height)mm
10crane needed or notIf yes, _____units, max. lifting weight____tons; max. lifting height _____m
China Steel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop supplier

Steel Structure Helicopter Hangar Construction Steel Frame Structure Maintenance Workshop

Inquiry Cart 0